Laserfiche WebLink
Existing Fees <br />Scenario 1: Single Family Residential <br />developer is higher than stated. <br />Top Soil <br />Grass /Sod <br />Trees <br />Shrubs <br />Radon Barrier <br />Foundation Drainage <br />Certificate of Occupancy <br />Builder License <br />Base Building Permit Fee <br />Internal Plan Review Fee <br />City Sewer Connection <br />City Water Connection <br />Water Availability Charge <br />Sewer Availability Charge <br />SAC handling Fee <br />Water Meter /Horn <br />Mechanical Permit <br />Plumbing Permit <br />*Cost does not reflect developer installed (DI) and assessed (ASSD) <br />120 Unit Single Family Development: 29.75 Acres <br />Sewer Trunk <br />Water Trunk <br />Storm Water Trunk <br />Storm Water Management <br />Park Dedication (cash) <br />Trail Fees <br />Street /Traffic Signs <br />Future Seal Coating <br />Street Lights <br />$124,741 <br />DI <br />DI <br />NA <br />$292,200 <br />OT FE <br />DI <br />NA <br />DI <br />$119,000 <br />$104,125 <br />ASSD <br />UTLY <br />$240,000 <br />DI <br />$3,000 <br />CTY <br />DI <br />$212,400 <br />$36,000 <br />$163,923 <br />NA <br />$573,000 <br />OT FE <br />DI <br />NA <br />DI <br />$249,000 <br />$789,000 <br />NA <br />NA <br />$420,000 <br />NA <br />DI <br />NA <br />DI <br />ASSD <br />ASSD <br />ASSD <br />$23,520 <br />$436,680 $19 <br />DI <br />DI $1 <br />$24,000 $6 <br />$44,800 $3 <br />SECTION B: Blaine Coon Rapids Dayton Medina Elk River Cam! <br />$66 <br />$68 <br />n <br />n <br />SECTION TOTAL: <br />GRAND TOTAL: <br />4 " <br />Yes <br />Yes <br />No <br />No <br />No <br />4 " <br />Yes <br />Yes <br />No <br />No <br />No <br />6" <br />Yes <br />Yes <br />No <br />Yes <br />No <br />0" <br />Yes <br />Yes <br />No <br />No <br />Yes <br />4 " <br />Yes <br />Yes <br />No <br />Yes <br />Yes <br />$1,200 NA <br />NA NA <br />$160,200 $164,280 <br />$27,600 $106,302 <br />OT FE $12,000 <br />DI $12,000 <br />$184,320 NA <br />$267,600 $267,600 <br />NA $6,000 <br />NA $36,000 <br />$18,000 $23,350 <br />$24,000 $16,740 <br />NA <br />$1,200 <br />$286,800 <br />NA <br />$18,000 <br />$18,000 <br />NA <br />$321,000 <br />NA <br />$36,215 <br />$24,000 <br />$24,000 <br />NA: Not applicable /No answer ASSD: Assessed based on actual construction cost <br />DI: Developer installed OT FE: Accounted for in other fee <br />UTLY: Paid for through utilities CITY: City Responsibility <br />*Cost does not reflect developer installed (DI) and assessed (ASSD) <br />N <br />SECTION TOTAL: $416,941* $466,125* $985,323* $1,458,000* $529,000* $33- <br />• •• ••• E.•'• <br />1. •• 11•1 <br />NA NA N <br />NA $600 $E <br />$145,440 $162,930 $16; <br />$94,560 $105,905 $10! <br />$12,000 $7,800 $16, <br />$12,000 $7,800 $6, <br />NA $360,000 $24 <br />$267,600 $504,120 $27; <br />NA NA N <br />$50,400 $30,672 $57 <br />$24,000 NA $8, <br />$26,400 NA $18 <br />$682,920.00 $644,271.60 $729,214.80 $632,400.00 $1,179,826.80 $661, <br />$1,099,861* $1,110,396.60* $1,714,537.30* $2,090,400.00* $1,708,826.80* $999, <br />1 <br />