My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/22/2011
Ramsey
>
Public
>
Agendas
>
Council
>
2011
>
Agenda - Council - 11/22/2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 2:22:14 PM
Creation date
11/17/2011 4:02:31 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/22/2011
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
515
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Capital Improvement Program <br />City of Ramsey, Minnesota <br />Project # 12_STRM_001 <br />Project Name Stormwater Drainage Improvements <br />Description <br />This project will address stormwater drainage problems reported in 2011. <br />Justificatio n <br />These projects will add storm sewer pipe, clean ditches and address standing water concerns. <br />- 156th and Armstrong - Clean ditch or add storm sewer 2012 $ 30,000 <br />- TH47 at 149th - Revise pond outlet structure, clean downstream pipes 2012 $ 10,000 <br />- Rum River Hills Golf Course - Replace outlet pipe and control structure 2012 $ 60,000 <br />- 156th Lane and Juniper Ridge Drive - Install pipe to relieve water backing up in existing pipes 2013 $ 350,000 <br />- 167th and Sodium - Clean roadside ditches and check downstream drainage ways 2012 $ 10,000 <br />- Riverdale Drive (E. of Dolomite) - Water treatment structure installation to improve watershed 2013 $30,000. <br />Revised 10 /2011 <br />Expenditures <br />Total Project Cost: $490,000 <br />Funding Sources <br />Improvements Other than Build 110,000 380,000 490,000 <br />Total 110,000 380,000 490,000 <br />Storm Water Utility Fund 110,000 380,000 490,000 <br />Total <br />2012 thru 2016 <br />Department Stormwater Utility <br />Contact <br />Type Improvement <br />Useful Life 50 Years <br />Category Storm Water Utility Improvem <br />Priority 6- Planned <br />Status Active <br />2012 2013 2014 2015 2016 Total <br />2012 2013 2014 2015 2016 Total <br />110,000 380,000 490,000 <br />PAGE 233 <br />
The URL can be used to link to this page
Your browser does not support the video tag.