Laserfiche WebLink
Capital Improvement Program <br />City of Ramsey, Minnesota <br />Project # 07 -WTR -001 <br />Project Name Well Rehabilitation & Pump Replacement <br />Description <br />Justification <br />Prior <br />44,000 <br />Total <br />Prior <br />44,0001 <br />Revised 10 /2011 <br />Total Total <br />2012 thru 2016 <br />Department Water Utility <br />Contact <br />Type Improvement <br />Useful Life 20 Years <br />Category Water Utility Improvement <br />Priority 6- Planned <br />Status Active <br />Total Project Cost: $214,000 <br />This program establishes a preventative maintenance schedule for the eight municipal wells which are the utilities sole water sources. The <br />following schedule is anticipated: 2012- Well #4; 2013- Well #3; 2014 - Well #5; 2015- Well #6; 2016 - Well #7; 2017- Well #8 <br />Well pumping is highly variable throughout the year. Regular maintenance during low pumping periods will minimize the possibility that a well <br />will be out of service during the peak demand period. The rehabilitation will update the control cabinets and install variable frequency drives on <br />wells 3 and 4. AVFP conserves energy and may be eligible for rebates. <br />Expenditures 2012 2013 2014 2015 2016 Total <br />Improvements Other than Build 50,000 58,000 30,000 32,000 170,000 <br />Total 50,000 58,000 30,000 32,000 170,000 <br />Funding Sources 2012 2013 2014 2015 2016 Total <br />Water Utility Fund 50,000 58,000 30,000 32,000 170,000 <br />50,000 58,000 30,000 32,000 170,000 <br />PAGE 301 <br />