Laserfiche WebLink
ikewed Tight Diamond with SW Loop <br />Ivd.) <br />:R 2010 <br />Wall needed to <br />salvage building <br />otherwise, property <br />is a total take <br />Sunwood Drive NE <br />&Nor rtailwav <br />Riverdale Drive NE <br />Pros: <br />• Reduced right-of-way <br />impacts <br />• Reduced right-of-way and <br />construction costs <br />• Less circuitous access <br />to businesses on <br />the south side <br />when compared to <br />Alternative B1 <br />Cons: <br />• Less traditional <br />interchange <br />configuration <br />• Skew US10 results in <br />longer bridge <br />Cost: $31.3 Million ($2010) <br />Costs include Right -of -Way and <br />Construction <br />Right -of -Way Impacts: <br /># of Parcels Acres <br />Strip Takings: 9 3.2 <br />Total Takings: 10 10.8 <br />TOTAL: 19 14.0 <br />1 <br />WSB <br />