Laserfiche WebLink
1(2011: Proposed Changes) <br />Scenario 1: Single Famil <br />developer is higher than stated. <br />Residential <br />*Cost does not reflect developer installed (DI) and assessed (ASSD) <br />120 Unit Single Family Development: 29.75 Acres <br />SECTION B: <br />Blaine <br />Coon Rapids <br />Dayton <br />Medina <br />Sewer Trunk <br />Water Trunk <br />Storm Water Trunk <br />Storm Water Management <br />Park Dedication (cash) <br />Trail Fees <br />Street/Traffic Signs <br />Future Seal Coating <br />Street Lights <br />$124,741 <br />DI <br />DI <br />NA <br />$119,000 <br />$104,125 <br />ASSD <br />UTLY <br />$212,400 <br />$36,000 <br />$163,923 <br />NA <br />$249,000 <br />$789,000 <br />NA <br />NA <br />Elk River Cam! <br />ASSD <br />ASSD <br />ASSD <br />$23,520 <br />$66 <br />$68 <br />9; <br />$292,200 <br />$240,000 <br />$573,000 <br />$420,000 <br />$436,680 $1 <br />OT FE <br />DI <br />OT FE <br />NA <br />DI <br />DI <br />$3,000 <br />DI <br />DI <br />DI <br />$1 <br />NA <br />DI <br />CTY <br />DI <br />NA <br />DI <br />NA <br />DI <br />$24,000 $6, <br />$44,800 $3, <br />SECTION TOTAL: <br />$416,941* <br />$466,125* <br />$985,323* <br />$1,458,000* $529,000* $33- <br />SECTION C: <br />Blaine <br />Coon Rapids <br />Dayton <br />Medina <br />Top Soil <br />Grass/Sod <br />Trees <br />Shrubs <br />Radon Barrier <br />Foundation Drainage <br />4" <br />Yes <br />Yes <br />No <br />No <br />No <br />4" <br />Yes <br />Yes <br />No <br />No <br />No <br />6" <br />Yes <br />Yes <br />No <br />Yes <br />No <br />0" <br />Yes <br />Yes <br />No <br />No <br />Yes <br />Elk River Cam! <br />4" <br />Yes <br />Yes <br />No <br />Yes <br />Yes <br />SECTION D: <br />Blaine <br />Coon Rapids <br />Dayton <br />Medina <br />kin <br />Certificate of Occupancy <br />Builder License <br />Base Building Permit Fee <br />Internal Plan Review Fee <br />■ <br />City Sewer Connection <br />City Water Connection <br />Water Availability Charge <br />Sewer Availability Charge <br />SAC handling Fee <br />Water Meter/Horn <br />Mechanical Permit <br />Plumbing Permit <br />$1,200 <br />NA <br />$160,200 <br />$27,600 <br />OT FE <br />DI <br />$184,320 <br />$267,600 <br />NA <br />NA <br />$18,000 <br />$24,000 <br />NA <br />NA <br />$164,280 <br />$106,302 <br />$12,000 <br />$12,000 <br />NA <br />$267,600 <br />$6,000 <br />$36,000 <br />$23,350 <br />$16,740 <br />NA <br />$1,200 <br />$286,800 <br />NA <br />$18,000 <br />$18,000 <br />NA <br />$321,000 <br />NA <br />$36,215 <br />$24,000 <br />$24,000 <br />NA <br />NA <br />$145,440 <br />$94,560 <br />$12,000 <br />$12,000 <br />NA <br />$267,600 <br />NA <br />$50,400 <br />$24,000 <br />$26,400 <br />Elk River Cam! <br />NA <br />$600 <br />$162,930 <br />$105,905 <br />$7,800 <br />$7,800 <br />$360,000 <br />$504,120 <br />NA <br />$30,672 <br />NA <br />NA <br />$E <br />$16; <br />$10! <br />$6, <br />$6, <br />$24 <br />$27; <br />$57 <br />$8, <br />$18 <br />SECTION TOTAL: $682,920.00 <br />GRAND TOTAL: $1,099,861 * <br />NOTE: changes not depicted in the chart: <br />$644,271.60 <br />$1,110,396.60* <br />$729,214.80 <br />$1,714,537.30* <br />$632,400.00 $1,179,826.80 $661, <br />$2,090,400.00* $1,708,826.80* $999, <br />(1) $1,200 reduction in erosion control admin fees <br />(2) $1,200 reduction in landscape admin fees <br />(3) Unknown reduction to topsoil <br />(4) Unknown reds <br />(5) Unknown redL <br />