Laserfiche WebLink
St Anthony Village <br />St Francis <br />Victoria <br />Waconia <br />Watertown <br />Wayzata <br />Zimmerman <br />10,000 - 20,000 <br />Columbia Heights <br />Farmington <br />Ham Lake <br />Lino Lakes <br />Mounds View <br />Northfield <br />Robbinsdale <br />Vadnais Heights <br />West St Paul <br />hole 125 trench 70/100 ft <br />$40 registration <br />200 Base + Per Foot Charge <br />$400 plus $0.25 per foot over 300 feet <br />$150/St & $50/blvd <br />N/A <br />Utility Permit Rq d - see #66 <br />$125, registration $25 <br />0/23/20n7 <br />4/26/2011 <br />150 4/25/2011 <br />4/29/2011 <br />300 4/14/2011 <br />4/12/2011 <br />$775 4/12/2011 <br />2/17/2009 <br />4/25/2011 <br />5/4/2011 <br />$150.00 5/6/2011 <br />150 2/24/2009 <br />4/14/2011 <br />4/13/2011 <br />64.42 plus 23.85/inspection plus escrow as reqd. <br />$35/utility company-$50 all others <br />$150.00 Min <br />Contractor City licensed only <br />5/13/2011 <br />5/5/2011 <br />4/11/2011 <br />4/25/2011 <br />Greater than 20,000 <br />Andover 10 4/27/2011 <br />Apple Valley 150 5/4/2011 <br />Blaine $10/$25 4/26/2011 <br />Bloomington $152 5/6/2011 <br />Brooklyn Center N/A 4/14/2011 <br />Brooklyn Park $25 small utility 5/5/2011 <br />Burnsville $74 + $.07/foot 5/6/2011 <br />$40/hole <br />Coon Rapids $125.00 1/18/2011 <br />Reg. 100.00/ Excavation -Hole 200.00/ Excavation - <br />Trench 60.00 per 100 lineal feet+hole fee (200)/ <br />Cottage Grove Obstruction 200.00+.15 per lineal feet of obs. 8/17/2011 <br />Crystal $27.25 4/12/2011 <br />Eagan 20-250 based on type 4/20/2011 <br />Eden Prairie N/A 4/22/2011 <br />Reg. yrly $200; Exc Permit 75; Addl paved area <br />35; Addl unpaved $20; Underground directional <br />boring 45/100 I.ft.; Underground open trench <br />Edina 60/100 I .ft. 5/10/2011 <br />$100 3/24/2009 <br />right-of-way permit / $250 excavation permit / $50 <br />obstruction / $20 extension / $125 delay penalty 4/4/2007 <br />Hastings varies 4/12/2011 <br />Inver Grove Heights varies 4/25/2011 <br />N/A 3/4/2009 <br />N/A 5/1 1 /'70n7 <br />Minneapolis unknown - other dept 6/27/2011 <br />Minnetonka N/A 5/3/2011 <br />New Brighton $160 PERMIT+ $50 ANNL REG FEE 4/20/2011 <br />