My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 12/01/2011 - Work Session
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2011
>
Agenda - Planning Commission - 12/01/2011 - Work Session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:09:33 AM
Creation date
11/23/2011 4:31:32 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Title
Work Session
Document Date
12/01/2011
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
534
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lino Lakes 105 4/14/2011 <br />replace $25 1st window, $2.50 each additional, <br />Mounds View $50 egress 4/13/2011 <br />Northfield Based on value 5/13/2011 <br />Robbinsdale $50 + $25 for each insp over 1 5/5/2011 <br />Rosemount Replacement cost: $46.50 3/15/2007 <br />Vadnais Heights $80.00 flat fee 4/11/2011 <br />West St Paul Cost of Project 4/25/2011 <br />Greater than 20,000 <br />Andover N/A 4/27/2011 <br />Apple Valley 105 5/4/2011 <br />SF=$30/window/max $150 - MF $30/window/max <br />Blaine $360+5 surcharge 4/26/2011 <br />Based on vaulation of job cost. If replacing same <br />Bloomington size, no permit required. 5/6/2011 <br />Brooklyn Center based on value 4/14/2011 <br />Brooklyn Park $100.57 5/5/2011 <br />Burnsville $73.75 Replacement Fee 5/6/2011 <br />Chanhassen Separate Permit - Based on Value 2/11/2009 <br />Coon Rapids Based on value 1/18/2011 <br />Cottage Grove 120.00-220.00 8/17/2011 <br />Crystal $80 for 1-3 windows; $155 for 4+ windows 4/12/2011 <br />Eagan 90-180 based on valuation 4/20/2011 <br />Eden Prairie Value Based 4/22/2011 <br />Edina Value based: $5000 value = 111.25 5/10/2011 <br />Elk River $75 + .50 state surcharge 3/24/2009 <br />Fridley Included 4/4/2007 <br />Hastings $55.00 4/12/2011 <br />Inver Grove Heights based on job valuation 4/25/2011 <br />Lakeville $40.00 Replace with new size 3/4/2009 <br />Maple Grove Sliding schedule on value 5/11/2007 <br />Minneapolis N/A 6/27/2011 <br />Minnetonka N/F 5/3/2011 <br />New Brighton N/F 4/20/2011 <br />New Hope included in new bldg permit 5/13/2011 <br />Oakdale N/A 4/6/2007 <br />Plymouth N/A 4/25/2011 <br />Prior Lake $74.75 5/9/2011 <br />Richfield based on project valuation 5/4/2011 <br />Savage $89.75 5/17/2011 <br />Shakopee $85.00 5/4/2011 <br />Shoreview Valuation 4/26/2011 <br />St Paul 7/10/2007 <br />based on value of job, included in building permit <br />Woodbury fee for new home construction 4/22/2011 <br />Gas Piping <br />Less than 2,500 <br />Excelsior $7.50 - 1st 3 units; $4.50 - ea. add I unit 5/10/2011 <br />Greenwood $7.50 per unit 4/11/2011 <br />Hampton N/F 3/28/2007 <br />Hanover N/A 2/5/2009 <br />Lake St Croix Beach N/A 2/24/2009 <br />Lauderdale $.75 per fixture on mechanical permit 5/23/2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.