My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 12/01/2011 - Work Session
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2011
>
Agenda - Planning Commission - 12/01/2011 - Work Session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:09:33 AM
Creation date
11/23/2011 4:31:32 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Title
Work Session
Document Date
12/01/2011
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
534
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Equipment, mechanical systems, transformers, etc. must be screened from view in a way that is <br />integral to the architecture of the building. Screening should be accomplished with materials <br />similar to or compatible with materials used on the main structure; metal fencing or mechanical <br />vent screens alone are not sufficient. <br />• Roof lines and cornice details shall be completed in a 3-dimensional manner so that the back of <br />roof features or similar unfinished areas are not visible. <br />Roof line - <br />- parapet or <br />enlarged <br />cornice <br />Finish <br />r materials on <br />all side <br />Retail/Commercial <br />— Building <br />— Front corner view of <br />architectural pier <br />Back (roof) view of <br />architectural pier — <br />element is constructed in 3 <br />dimensions with finish <br />materials on all sides <br />• Provide parking spaces for typical daily use, satisfying both quantity and <br />location needs through a mix of on street, small surface lot, underground <br />and ramped parking solutions <br />• Provide options for additional/overflow parking to support holiday traffic <br />and special events including porous pavements, turf parking areas (Netlon <br />and other soil amendments) or shuttle service from nearby parking areas <br />• Encourage shared parking solutions that target around the <br />clock shifts in destination, audience or take advantage of <br />peak/off-peak hours of operation for various uses within <br />the core area <br />• Promote municipal parking ramps as the primary facility to <br />meet public parking needs within the core area <br />• Minimize surface parking lots in favor of other solutions <br />including underground parking to serve residential <br />buildings, on -street parking to serve retail shops and <br />parking ramps <br />Design Framework — The COR <br />Page 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.