Laserfiche WebLink
REQUEST FOR AERIAL MAPPING <br />By: Steven Jankowski, City Engineer <br /> <br />CASE <br /> <br />Background: <br /> <br />In the 1994 Sudget, $30,000 has been allocated for topographic mapping for the City. <br />This is an e~timate of the amount of money needed to have 2-foot contour intervals <br />prepared for the rapidly urbanizing southeastern quadrant of the City. <br /> <br />The use of this mapping will be extremely helpful in preparing engineering estimates and <br />planning for~ the extension of sewer, water, roads, and storm sewer improvements. <br />However, the!single most immediate use for the mapping will be to provide basic formation <br />for the development of a Comprehensive Storm Sewer Plan to service this area. <br /> <br />Attached is aproposal from MARKIa'URD, a firm which specializes in this type of work <br />and whom A0oka County has used on a consistent basis for their aerial photography. The <br />area proposed for mapping is identified in the proposal. This area coincides with three <br />major drainage districts identified in the City's Comprehensive Storm Water Drainage Plan <br />which was prepared in 1980. This is significant in that the adjacent areas will not drain into <br />the area ident!fied for topographic mapping. A drainage plan can therefore be completed <br />for this area v~tithout concern for external flows coming into the area. <br /> <br />The proposal!for the work is in the amount of $29,600, which is within the project budget. <br />It should be rioted that this price includes $1,200 for 1994 aerial photography. You may <br />recall that thb County was flown for aerial photography the spring of 1993. However, <br />since the datg of the previous aerial flight, nine new subdivisions have been wholly or <br />partially developed within the proposed flight area. In view of this significant <br />development; ! believe it is worth adding four percent of the cost of the project to have the <br />most current information. <br /> <br />Recommendation: <br />I would reqqest that the Committee recommend the acceptance of the proposal from <br />MARKHURD to perform the aerial mapping. It should be noted that authorization to <br />proceed shot/Id occur as soon as possible so that the aerial flight may take place prior to <br />substantial leafing out of the vegetation. <br /> <br />Committee ,Action: <br /> <br />Motion to re0pmmend that Council accept the proposal from MARKHLrRD to perform the <br />aerial mapping. <br /> <br />Reviewed by: Copies also distributed to: <br /> <br />City Engineer Finance Officer <br />City Administrator <br /> <br />R&B: 04/12/94 <br /> <br /> <br />