My WebLink
|
Help
|
About
|
Sign Out
Home
11/07/94
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Road and Bridge Committee
>
Agendas
>
1994
>
11/07/94
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2025 4:28:38 PM
Creation date
10/20/2003 10:19:10 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Road and Bridge Committee
Document Date
11/07/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Case <br /> <br />POLICY FOR IMPROVEMENT PROJECTS <br />By: City Engineer Steven Jankowski <br /> <br />Background: <br /> <br />As a result of the Public Improvement Project ~'94-22, the sewer and water extension to a portion <br />of Pondvale Estal[es, the Council felt it beneficial to review our policy for public improvement <br />projects. It was s~ggested that public improvement projects be considered only on a subdivision <br />basis. <br /> <br />Our current policy;, which is basically defined by our past practice, is as follows: <br /> On relatively moderate cost public improvements, which would include sealcoating, street <br /> overlays, }md more recently street light installation, only entire subdivisions have been <br /> consideredfor such improvements. On more expensive type public improvements, such as <br /> the paving of dirt streets, we have established improvement projects which included only a <br /> portion of a subdivision. Such public improvement project boundaries have been <br /> establishegl on a case by case basis and have been defined in the feasibility study prepared <br /> by the Engineer. The Council may order an alteration of the boundary. <br /> <br /> Only recently have we received petitions for the extension of sewer and water, and only in <br /> one case nave these petitions come from residents within a platted subdivision. Both of <br /> these petitions came from the Pondvale and Pondvale 2nd subdivision. In 1993, sewer and <br /> water wag extended to the portion of the Pondvale Estates subdivision served by 149th <br /> Lane N.W. A second project in that same year considered the Pondvale Estates and <br /> PondvalerEstates 2nd Addition serviced by 150th Lane N.W. The former project <br /> proceeded successfully, the latter project was defeated by petition. <br /> <br />Observations: <br /> <br />tt is in the best interest of the City sewer and water utility to have as many customers, as possible, <br />since this reduce~ costs to alt of the utility customers. From that standpoint, the City should <br />encourage the extension of sewer and water whenever petitioned. It should also be recognized that <br />the high cost ass0~ciated with sewer and water represents a veT considerable cost to homeowners <br />and every accommodation should be afforded to insure these improvements are affordable. <br />Finally, it should be recognized that, in the large majority of situations, unanimity cannot be <br />expected. <br /> <br />Alternatives: <br /> <br />Alternative #1: <br /> <br />Maintain the existing policy whereby the project boundary is determined on a case by case basis <br />and may be adjt~.sted based upon testimony at public, hearing. This existing policy might be <br />modified in a number of ways which could include holding an informal neighborhood meeting <br />prior to preparing the feasibility study, or the petition could.be reviewed by the Road and Bridge <br />Committee to solicit input on project boundaries, or a combination of both of these. The advantage <br />of this procedure'is that it offers maximum opportunity for establishing a boundary which will <br />result in a successful project. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.