My WebLink
|
Help
|
About
|
Sign Out
Home
12/13/11
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Housing & Redevelopment Authority
>
Agendas
>
2010's
>
2011
>
12/13/11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2025 11:08:36 AM
Creation date
12/8/2011 3:34:26 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Housing & Redevelopment Authority
Document Date
12/13/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
exiting to the west on Sunwood Drive to facilitate movement into the left turn lanes <br />which is the critical movement through the Armstrong/Sunwood intersection. The <br />roundabout is designed to accommodate 18-wheel truck traffic (WB65). <br />The roundabout was also analyzed to determine its capacity to handle traffic volumes <br />that exceed the projected build -out forecasts. The proposed enhanced single lane <br />roundabout can handle traffic volumes that are 43% greater than the build -out <br />forecasts. The proposed roundabout can also be easily modified to a full two lane <br />roundabout that would be able to accommodate volumes 63% greater than the build - <br />out forecasts. Figure 2 also shows the improvements that would be needed to construct <br />the full two lane roundabout if The COR generates traffic in excess of current <br />projections. �h <br />Figure 3: Initial and Ultimate Roundabout Design (Ourston Roundabout Engineering) <br />Initial Roundabout Design <br />Sunwood Drive <br />Ultimate Roundabout Design <br />Sunwood Drive is a Municipal State Aid (MSA) collector street. It runs in an east/west <br />direction through the southern portion of The COR connecting Ramsey Boulevard to <br />Armstrong Boulevard. The current Armstrong/Sunwood intersection needs to be closed <br />because of the grade differential that will be created by the TH10/Armstrong <br />Interchange. The new location for the Armstrong/Sunwood intersection is further north <br />along Armstrong Boulevard near the point where the extension of Ramsey Parkway was <br />originally planned to intersect. The new Armstrong/Sunwood intersection improves the <br />traffic flow on Armstrong Boulevard and into The COR by consolidating traffic at a single, <br />better located intersection than originally proposed in the RTC plans. The proposed <br />realignment of Sunwood Drive is presented in Figure 4. <br />City of Ramsey <br />Sunwood Drive <br />L A NDF ORM <br />Project No. RAM11008 <br />Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.