My WebLink
|
Help
|
About
|
Sign Out
Home
12/13/11
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Housing & Redevelopment Authority
>
Agendas
>
2010's
>
2011
>
12/13/11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2025 11:08:36 AM
Creation date
12/8/2011 3:34:26 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Housing & Redevelopment Authority
Document Date
12/13/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
THE <br />Water Main <br />Storm Sewer <br />Total <br />Storm Water Management <br />Trunk storm water management facilities including water quality treatment, storm <br />water storage and storm sewers were previously installed as part of the original Ramsey <br />Town Center (RTC) development. This project includes the construction of storm sewer <br />along the realigned Sunwood Drive connecting to the existing trunk storm sewer on the <br />east end of the project. Storm sewer services will be extended into the commercial area <br />between Sunwood Drive and Armstrong Boulevard. <br />Cost Estimates <br />Cost estimates for the proposed improvements are presented in Appendix C. The <br />estimates include construction, a 10% allowance for contingencies and a 20% allowance <br />for indirect costs including design, construction administration, construction staking and <br />observation, record drawings and administration. A summary of the cost estimates is <br />presented in Table 2. <br />Table 2: Total Estimates Costs <br />Item <br />Sunwood Drive <br />1 lL <br />Property Acq <br />*h. <br />Total Estimates Costs <br />'4411 Estimated Total Costs <br />$1,151,000 <br />$131,000 <br />$87,000 <br />$1,369,000 <br />The rgnment of Armstrong Bou evard in anticipation of the overpass requires the <br />acquisition of additional right of way. There are five properties immediately affected by <br />the proposed project, all requiring some acquisition depending on the ultimate <br />configuration. These properties are showed on Figure 7. <br />11Vr <br />City of Ramsey <br />Sunwood Drive <br />LAND FORM <br />Project No. RAM11008 <br />Page 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.