Laserfiche WebLink
THE <br />Project Schedule <br />Table 9: Project Schedule <br />Task <br />Order Feasibility Study <br />Accept Feasibility Study and Order Plans and Specifications <br />Approve Plans, Specifications and Order Advertisement for Bids <br />Receive Bids <br />Begin Construction <br />Substantial Completion <br />Final Completion <br />fir <br />Summary and Conclusions <br />The realignment of Sunwood Drive is necessary to accommodate the gr8 <br />Completion Date <br />July 26, 2011 <br />January 10, 2012 <br />April 2012 <br />May 2012 <br />June 2012 <br />September 2012 <br />November 2012 <br />e changes on <br />Armstrong Boulevard associated with the new TH10/Armstrong Interchange. The work <br />outlined in this report is consistent with Development Plan 5.03 of The COR. The <br />proposed roadway improvements meet Municipal State Aid standards. The provision of <br />a roundabout at the Sunwood/Ramsey Parkway intersection provides better <br />management of the projected ultimate traffic and also provides flexibility should those <br />projections be exceeded. <br />MEW <br />The costs associated with the proposed improvements are presented in the Appendices <br />and summarized in the Cost Estimates section. It is our professional opinion that the <br />benefits derived from this project exceed the associated costs. The work is cost effective <br />and feasible from an engineering standpoint. <br />City of Ramsey <br />Sunwood Drive <br />LAND FORM <br />Project No. RAM11008 <br />Page 16 <br />