Laserfiche WebLink
Storm Sewer Cost Estimates <br />Project: Sunwood Drive Realignment <br />Ramsey, MN <br />THE <br />eke <br />RAMSEY, MINNESOTA <br />• • <br />• • <br />LAN DFORM <br />• <br />From Site to Finish <br />Item No. Item <br />Units <br />Quantity <br />' Unit Price <br />Total Price <br />2104.509 Remove Storm Sewer Structure EACH 1 $500.00 $500.00 <br />2503.541 15" RC Pipe Sewer DES 3006 CL V LF 274 $27.00 $7,398.00 <br />2503.541 18" RC Pipe Sewer DES 3006 CL III LF 287 $28.00 $8,036.00 <br />2503.541 21" RC Pipe Sewer DES 3006 CL III LF 184 $32.00 $5,888.00 <br />2503.541 24" RC Pipe Sewer DES 3006 CL III LF 30 $38.00 $1,140.00 <br />2503.541 27" RC Pipe Sewer DES 3006 CL III LF 231 $45.00 $10,395.00 <br />2503.602 Connect To Existing Storm Sewer EACH 1 $500.00 $500.00 <br />2506.501 48" Diameter Catch Basin Neenah Casting R-3067 EACH 10 $1,500.00 $15,000.00 <br />2506.501 Catch Basin Neenah Casting R-3067 - Special EACH 1 $12,000.00 $12,000.00 <br />2573.530 Storm Drain Inlet Protection Type C EACH 12 $350.00 $4,200.00 <br />$65,057.00 <br />10% Contingency: <br />Subtotal: <br />21% Indirect Costs <br />$6,505.70 <br />$71,562.70 <br />$15,028.17 <br />Storm Sewer Estimated Cost: <br />$86,590.87 <br />Summary <br />Street Work Estimated Cost: <br />Watermain Estimated Cost: <br />Storm Sewer Estimated Cost: <br />Total Estimated Cost: <br />Total Price <br />$1,151,547.66 <br />$130,837.30 <br />$86,590.87 <br />$1,368,975.83 <br />