Laserfiche WebLink
OPINION OF PROBABLE COST <br />CSAH 83 (ARMSTRONG BLVD) AT SUNWOOD DR <br />WSB Project: CSAH 83 at Sunwood Dr <br />Project Location: Ramsey, MN <br />WSB Project No: 01973-010 <br />ITEM Unit ESTIMATEI <br />NUMBER DESCRIPTION UNIT Price QUANTITY <br />Storm Sewer Improvements <br />2501.515 24" RC PIPE APRON EACH $625.00 3 <br />2501.602 TRASH GUARD FOR 24" PIPE APRON EACH $350.00 3 <br />2503.541 15" RC PIPE SEWER DESIGN 3006 CL V LIN FT $27.00 564 <br />2503.541 18" RC PIPE SEWER DESIGN 3006 CL III LIN FT $28.00 297 <br />2503.541 21" RC PIPE SEWER DESIGN 3006 CL III LIN FT $32.00 188 <br />2503.541 24" RC PIPE SEWER DESIGN 3006 CL III LIN FT $38.00 650 <br />2506.501 CONST DRAINAGE STRUCTURE DESIGN SD-48 LIN FT $325.00 108 <br />2506.501 CONST DRAINAGE STRUCTURE DES 48-4020 LIN FT $400.00 22 <br />2506.516 CASTING ASSEMBLY EACH $900.00 24 <br />2506.522 ADJUST FRAME & RING CASTING EACH $275.00 3 <br />2511.515 GEOTEXTILE FILTER TYPE IV SQ YD $3.00 25 <br />2511.607 RANDOM RIPRAP CLASS III SPECIAL CU YD $150.00 20 <br />Total Storm Sewer Improvements <br />plus 10% Contingencies <br />Total Storm Sewer Construction Cost <br />plus 21%Admin, Legal Etc <br />Total Storm Sewer Improvement Cost <br />