My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 12/13/2011
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2011
>
Agenda - Public Works Committee - 12/13/2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 10:18:57 AM
Creation date
12/8/2011 4:06:34 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
12/13/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Proposed top of foundation (front and rear) <br />• All entryways; including walkouts & low basement windows (lowest opening) <br />• Existing and proposed along each side lot at the proposed front building line <br />• Emergency overflow locations & spot elevations along common drainage swales, <br />based on the approved grading plan <br />• Spot elevations a distance of 100' beyond the property limits to identify off -site <br />drainage considerations <br />8. Location and description of all easements and right-of-way <br />9. Location of curb & gutter or edge of traveled roadway; including top of curb or edge of <br />bituminous elevations at the extension of side lot lines, the mid -point of the lot, and the <br />existing or proposed driveway location <br />10. Note the percent driveway grade <br />11. On -site sewage treatment system location and potable well location, if applicable <br />12. Locations of proposed silt fence and existing developer installed erosion control <br />measures on the lot. <br />• An erosion control escrow must be posted prior to issuance of a permit, the amount <br />of which is listed in the annual rates and fees adopted by the City Council. This <br />requirement may be waived for single family residences and townhomes up to a 12 <br />unit building if the subdivision has a Stage 1 surety on file with the City & the <br />developer provides written authorization covering erosion control under their Stage <br />1 surety. A copy of the authorization must be filed with the permit. <br />13. An as -built certificate of survey (elevation certification) is required following the <br />installation of the footings and foundation to confirm conformance with proposed <br />structure elevations and setbacks. <br />14. Additional information as requested by the City Engineer <br />Please note! Surveys that do not include the above information or are not in compliance with <br />the approved eradine plan may be rejected and sent back for revision. If sienificant <br />differences exist from the approved eradine plan, a new eradine plan may be required. <br />B. Survey benchmarks shall be identified on certificate of survey — Benchmark must be <br />referenced from the nearest hydrant to proposed structure. <br />C. Field hubs shall be placed on site by a licensed surveyor to show top of foundation elevation <br />and setbacks. <br />Review of Certificate of Survey <br />The Planning Division will review the Certificate of Survey to ensure compliance with required <br />information to be provided, and development, subdivision, and zoning requirements. The <br />proposed lot grading will be reviewed by our City's Engineering Department to verify <br />compliance with the approved development grading plan and City grading standards. <br />
The URL can be used to link to this page
Your browser does not support the video tag.