Laserfiche WebLink
3.7 Right-of-way <br />The existing right-of-way width on Armstrong Boulevard within the project limits is 120 <br />feet south of 147th Avenue and 130 feet north of 147th Avenue. <br />Feasibility Report <br />Armstrong Boulevard and Relocated Sunwood Drive <br />Intersection Improvements <br />City of Ramsey, MN <br />WSB Project No. 1973-010 <br />Page 5 <br />