My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 12/13/2011
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2011
>
Agenda - Public Works Committee - 12/13/2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 10:18:57 AM
Creation date
12/8/2011 4:06:34 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
12/13/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE <br />Figure 4: Project Layout Map <br />SUNWOOD DRIVE <br />FUTURE R4_Ms <br />i <br />`►�i` 'fir <br />�\ t <br />1 <br />LEGEND <br />PAVED ROADWAY <br />- CONCRETE WALK <br />1 <br />CONCRETE MEDIAN <br />LANDSCAPE FEATURE ARE <br />- - - PROPOSED R.D.W. <br />PAVED ROADWAY (Fl11UREI- <br />BEGIN REALIGNMENT <br />*00 <br />Under the proposed realignment, Sunwood Drive turns north at a point approximately <br />700 feet east of its current intersection with Armstrong Boulevard. Sunwood Drive <br />continues northward to its intersection with the future Ramsey Parkway. At this <br />proposed roundabout intersection Sunwood Drive turns west to connect with <br />Armstrong Boulevard. Improvements to the new Armstrong/Sunwood intersection are <br />described in a separate preliminary engineering report by WSB & Associates, Inc. The <br />preparation of both reports was coordinated to provide an overall plan for the needed <br />improvements. <br />City of Ramsey <br />Sunwood Drive <br />LAND FORM <br />Project No. RAM11008 <br />Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.