|
DEVELOPMENT
<br />Specs Per Home: $165,000 valuation, 10,800 sq ft lot, .125 street signs, .266 street lights, 125 sq yds seal coating (120 total units)
<br />Fees /Charges
<br />Jan 2011
<br />2012 Proposed (some changes already made)
<br />Sewer Trunk -
<br />Lateral Sewer
<br />Water Trunk
<br />Lateral Water
<br />Storm Water Trunk
<br />Storm Water Mgmt
<br />Park Dedication
<br />Trail Fees
<br />Street /Traffic Signs
<br />Future Seal Coating
<br />Street Lights
<br />Street Lights O &E
<br />$1,318.00
<br />$33.24
<br />$2,308.00
<br />$75.85
<br />$0.00
<br />$465.00
<br />$2,475.00
<br />$600.00
<br />$28.12
<br />$181.25
<br />$453.32
<br />$78.20
<br />■
<br />$1,271.00 1 i per unit, -3.7%
<br />$32.06
<br />$2,226.00
<br />$73.14
<br />$0.00
<br />$448.00
<br />$2,475.00
<br />$600.00
<br />Devel. Inst.
<br />Devel. Inst.
<br />Devel. Inst.
<br />$78.20
<br />flat rate per connection to project, -3.7% (based on 120 units)
<br />per unit, -3.7%
<br />flat rate per connection to project, -3.7% (based on 120 units)
<br />NO CHARGE
<br />per unit
<br />per unit
<br />per unit
<br />$225 per sign (120 unit devel, 15 total signs, .125 per unit)
<br />$1.45 per sq. yds. (120 unit devel, 15K total yds., 125 per unit)
<br />$1,700 per light (120 unit devel, 32 total lights, .266 per unit)
<br />$294 per light (120 unit devel, 32 total lights, .266 per unit)
<br />T
<br />DEVELOPER SUB TOTAL
<br />$17,042.32 $15,904.05 Estimated $1,134 devel. reduction (6.6 %) from 2011 to 2012
<br />BUILDING
<br />Fees /Charges
<br />Jan 2011
<br />2012 Proposed (some changes already made)
<br />Certificate of Occupancy
<br />Builder License Verification
<br />Base Building Permit Fee
<br />Plan Review Fee
<br />City Sewer Connection
<br />City Water Connection
<br />Sewer Availability Charge
<br />SAC Handling Fee
<br />Water Availability Charge
<br />Water Meter /Horn
<br />Mechanical Permit
<br />Plumbing Permit
<br />Erosion Control Escrow
<br />Erosion Control Admin Fee
<br />$4.00
<br />$5.00
<br />$1,446.75
<br />$940.39
<br />$75.00
<br />$75.00
<br />$2,230.00
<br />$200.00
<br />$1701.00
<br />$434.59
<br />$150.00
<br />$200.00
<br />$1,500.00
<br />$100.00
<br />$0.00
<br />$5.00
<br />$1,446.75
<br />$940.39
<br />$75.00
<br />$75.00
<br />$2,365.00
<br />$25.00
<br />$1,638.06
<br />$434.59
<br />$150.00
<br />$200.00
<br />$1,500.00
<br />$0.00
<br />per unit (no charge in 2012)
<br />per builder
<br />per unit, 97 UBC ($165,000 Valuation), (25% for duplicates)
<br />per unit, 65% of 97 UBC ($165,000 Valuation)
<br />per unit
<br />per unit
<br />per unit (MetCouncil controlled)
<br />per address
<br />per address
<br />per unit
<br />per unit
<br />per unit
<br />per unit
<br />per unit
<br />}
<br />BUILDER SUB TOTAL $9,061.73
<br />$8,854.79 Estimated $206.94 builder reduction (2.3 %) from 2011 to 2012
<br />OTHER REQUIREMENTS
<br />Fees /Charges
<br />Jan 2011
<br />2012 Proposed (some changes already made)
<br />Top Soil
<br />Grass /Sod
<br />Trees
<br />Radon Barrier
<br />Foundation Drainage
<br />Yes, 6"
<br />Yes
<br />Yes
<br />Yes
<br />Yes
<br />Yes, 4"
<br />Yes
<br />Yes
<br />Yes
<br />Yes
<br />MnDOT Premium
<br />Yes on blvd, "established" elsewhere
<br />2 per home, 1" diameter
<br />Yes, per state requirements
<br />pipe yes, pump no
<br />CONDITIONAL (if owner wants to occupy before completion)
<br />Fees /Charges
<br />Jan 2011
<br />2012 Proposed (some changes already made)
<br />Landscape Escrow
<br />Landscape Escrow Admin Fee
<br />Driveway Escrow
<br />$5,000.00
<br />$100.00
<br />$2,000.00
<br />$5,000.00
<br />$0.00
<br />$2,000.00
<br />per unit (grass, top soil, trees)
<br />per unit
<br />per unit
<br />CONDITIONAL SUB TOTAL $7,100.00 $7,000.00 Estimated $100 reduction (1.40 %) from 2011 to 2012
<br />
|