Laserfiche WebLink
DEVELOPMENT <br />Specs Per Home: $165,000 valuation, 10,800 sq ft lot, .125 street signs, .266 street lights, 125 sq yds seal coating (120 total units) <br />Fees /Charges <br />Jan 2011 <br />2012 Proposed (some changes already made) <br />Sewer Trunk - <br />Lateral Sewer <br />Water Trunk <br />Lateral Water <br />Storm Water Trunk <br />Storm Water Mgmt <br />Park Dedication <br />Trail Fees <br />Street /Traffic Signs <br />Future Seal Coating <br />Street Lights <br />Street Lights O &E <br />$1,318.00 <br />$33.24 <br />$2,308.00 <br />$75.85 <br />$0.00 <br />$465.00 <br />$2,475.00 <br />$600.00 <br />$28.12 <br />$181.25 <br />$453.32 <br />$78.20 <br />■ <br />$1,271.00 1 i per unit, -3.7% <br />$32.06 <br />$2,226.00 <br />$73.14 <br />$0.00 <br />$448.00 <br />$2,475.00 <br />$600.00 <br />Devel. Inst. <br />Devel. Inst. <br />Devel. Inst. <br />$78.20 <br />flat rate per connection to project, -3.7% (based on 120 units) <br />per unit, -3.7% <br />flat rate per connection to project, -3.7% (based on 120 units) <br />NO CHARGE <br />per unit <br />per unit <br />per unit <br />$225 per sign (120 unit devel, 15 total signs, .125 per unit) <br />$1.45 per sq. yds. (120 unit devel, 15K total yds., 125 per unit) <br />$1,700 per light (120 unit devel, 32 total lights, .266 per unit) <br />$294 per light (120 unit devel, 32 total lights, .266 per unit) <br />T <br />DEVELOPER SUB TOTAL <br />$17,042.32 $15,904.05 Estimated $1,134 devel. reduction (6.6 %) from 2011 to 2012 <br />BUILDING <br />Fees /Charges <br />Jan 2011 <br />2012 Proposed (some changes already made) <br />Certificate of Occupancy <br />Builder License Verification <br />Base Building Permit Fee <br />Plan Review Fee <br />City Sewer Connection <br />City Water Connection <br />Sewer Availability Charge <br />SAC Handling Fee <br />Water Availability Charge <br />Water Meter /Horn <br />Mechanical Permit <br />Plumbing Permit <br />Erosion Control Escrow <br />Erosion Control Admin Fee <br />$4.00 <br />$5.00 <br />$1,446.75 <br />$940.39 <br />$75.00 <br />$75.00 <br />$2,230.00 <br />$200.00 <br />$1701.00 <br />$434.59 <br />$150.00 <br />$200.00 <br />$1,500.00 <br />$100.00 <br />$0.00 <br />$5.00 <br />$1,446.75 <br />$940.39 <br />$75.00 <br />$75.00 <br />$2,365.00 <br />$25.00 <br />$1,638.06 <br />$434.59 <br />$150.00 <br />$200.00 <br />$1,500.00 <br />$0.00 <br />per unit (no charge in 2012) <br />per builder <br />per unit, 97 UBC ($165,000 Valuation), (25% for duplicates) <br />per unit, 65% of 97 UBC ($165,000 Valuation) <br />per unit <br />per unit <br />per unit (MetCouncil controlled) <br />per address <br />per address <br />per unit <br />per unit <br />per unit <br />per unit <br />per unit <br />} <br />BUILDER SUB TOTAL $9,061.73 <br />$8,854.79 Estimated $206.94 builder reduction (2.3 %) from 2011 to 2012 <br />OTHER REQUIREMENTS <br />Fees /Charges <br />Jan 2011 <br />2012 Proposed (some changes already made) <br />Top Soil <br />Grass /Sod <br />Trees <br />Radon Barrier <br />Foundation Drainage <br />Yes, 6" <br />Yes <br />Yes <br />Yes <br />Yes <br />Yes, 4" <br />Yes <br />Yes <br />Yes <br />Yes <br />MnDOT Premium <br />Yes on blvd, "established" elsewhere <br />2 per home, 1" diameter <br />Yes, per state requirements <br />pipe yes, pump no <br />CONDITIONAL (if owner wants to occupy before completion) <br />Fees /Charges <br />Jan 2011 <br />2012 Proposed (some changes already made) <br />Landscape Escrow <br />Landscape Escrow Admin Fee <br />Driveway Escrow <br />$5,000.00 <br />$100.00 <br />$2,000.00 <br />$5,000.00 <br />$0.00 <br />$2,000.00 <br />per unit (grass, top soil, trees) <br />per unit <br />per unit <br />CONDITIONAL SUB TOTAL $7,100.00 $7,000.00 Estimated $100 reduction (1.40 %) from 2011 to 2012 <br />