|
TOTAL
<br />VALUATION
<br />FEE
<br />$1.00 to $500.00
<br />$23.00
<br />$501.00 to $2,000.00
<br />$23.50 for the first $500.00 plus $3.05 for each additional
<br />$100.00, or fraction thereof, to and including $2,000.00
<br />$2,001.00 to $25,000.00
<br />$69.25 for the first $2,000.00 plus $14.00 for each additional
<br />$1,000.00, or fraction thereof, to and including $25,000.00
<br />$25,001.00 to $50,000.00
<br />$391.25 for the first $25,000.00 plus $10.10 for each additional
<br />$1,000.00, or fraction thereof, to and including $50,000.00
<br />$50,001.00 to $100,000.00
<br />$643.75 for the first $50,000.00 plus $7.00 for each additional
<br />$1,000.00, or fraction thereof, to and including $100,000.00
<br />$100,001.00 to
<br />$993.75 for the first $100,000.00 plus $5.60 for each additional
<br />$500,000.00
<br />$1,000.00, or fraction thereof, to and including $500,000.00
<br />$500,001.00 to
<br />$3,233,75 for the first $500,000.00 plus $4.75 for each
<br />$1,000,000.00
<br />additional $1,000.00, or fraction thereof, to and including
<br />$1,000,000.00
<br />$1,000,001.00 and up
<br />$5,608.75 for the first $1,000,000.00 plus $3.15 for each
<br />additional $1,000.00, or fraction thereof
<br />Other Inspections and Fees:
<br />1. Inspections outside of normal business hours $47.00 per hour *
<br />2. Reinspection fees assessed under provisions of
<br />Section 305.8 $47.00 per hour *
<br />3. Inspections for which no fee is specifically indicated $47.00 per hour *
<br />(minimum charge — one -half hour)
<br />4. Additional plan review required by changes, additions
<br />or revisions to plans $47.00 per hour *
<br />5. For use of outside consultants for plan checking and
<br />inspections, or both Actual costs **
<br />EXTRACTED FROM 1997 UNIFORM BUILDING CODE
<br />TABLE NO. 1 -A — BUILDING PERMIT FEES
<br />*This is a "valuation" based permit schedule*
<br />* Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include,
<br />supervision, overhead, equipment, hourly wages and fringe benefits of the employees
<br />involved.
<br />** Actual costs include administrative and overhead costs. GIO26.doc
<br />
|