My WebLink
|
Help
|
About
|
Sign Out
Home
06/06/94
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Planning and Zoning
>
Agendas
>
1990's
>
1994
>
06/06/94
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2025 9:29:57 AM
Creation date
10/20/2003 2:42:04 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Planning and Zoning Commission
Document Date
06/06/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CASE # 3 <br /> REQUEST iFOR REVISED PRELIMINARY PLAT OF CHESTNUT HILL; <br /> CASE OF JOHN PETERSON, GOOD VALUE HOMES <br /> By: Zoning Administrator Sylvia Frolik <br />Background: <br /> <br />On May 22, 1990,~ the Ramsey City Council granted preliminary plat approval to Chestnut Hill. <br />The final phase ofiChestnut Hill included an extension of 145th Lane to the west that would turn <br />north and connect .io the future Sunwood Drive. The extension of 145th Lane included crossing a <br />wetland. On May 17, 1994, the developer submitted a request for revised preliminary plat to end <br />the western portion of 145th Lane as a cul-de-sac with no extension running north to Sunwood <br />Drive. : <br /> <br />The following items are enclosed for your information: <br /> <br />a) <br />b) <br />c) <br />d) <br /> <br />Site location map <br />ExCerpt from approved preliminary plat for subject area <br />Proposed revised preiminary for final phase of Chestnut Hill <br />City Staff review letter dated June 1, 1994 <br /> <br />Observations: <br /> <br />Since preliminary l~lat approval in 1990, wetland regulations have become more stringent and it is <br />no longer possible to construct roads through wetlands, even with mitigation, if there is an <br />alternative route. I.~ this particular case, the alternative would be to end 145th Lane with a cul-de- <br />sac before it reaches the wetland in the northwest corner of the plat. As proposed, the cul-de-sac <br />length does not exCb-..~l the 600 foot maximum. <br /> <br />This final phase of. Chestnut Hill was originally approved for 17 lots with 145th Lane consmacted <br />as a through street.! Under the cul-de-sac design, the developer is proposing a park area, an outlot <br />and 11 residential 10ts, for an overall decrease of 6 lots. However, the developer gained 2 lots by a <br />redesign of Chestnot Hill 4th Addition. Therefore, the total number of lots in the plat will be 96 or <br />4 less than origin[ally approved. However, there is the potential to regain 2 lots with the <br />resubdivision of O0tlot A provided the developer can acquire the adjacent property to the north to <br />help meet minimu~ area requirements. In this case, the total number of lots actually developed <br />will be 98 or 2 less~than the approved 100. <br /> <br />Although dead-ending the western portion of 145th Lane with a cul-de-sac will eliminate the <br />means for a conne~ction north to Sunwood Drive in this vicinity, the developer did provide a <br />northerly extension~fof Tungsten Street N.W. in the replat of Chestnut Hill 4th Addition that could <br />accommodate an exXension north to connect with Sunwood Drive and it is only 650-700 feet east of <br />the originally propdsed connection. <br /> <br />Recommendation: <br /> <br />City Staff recomme,nds revised preliminary plat approval of Chesnut Hill to design the western end <br />of 145th Lane N.V¢i as a cul-de-sac. <br /> <br />Commission Action: .' <br /> <br />Motion to recommend that City Council grant revised preliminary plat approval to Chestnut <br />Hill. <br /> <br />Review Checklist: City Engineer Steve Jankowski <br /> <br />PC: 6/6/94 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.