My WebLink
|
Help
|
About
|
Sign Out
Home
09/15/94 Jt. Planning and Zoning & EDC
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Planning and Zoning
>
Agendas
>
1990's
>
1994
>
09/15/94 Jt. Planning and Zoning & EDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2025 9:31:58 AM
Creation date
10/20/2003 3:28:19 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Jt. Planning and Zoning & EDC
Document Date
09/15/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXECUTIVE SUMMARY <br /> <br />Based upor~ a premise of amending the Ramsey Comprehensive Plan, the Planning Commission <br />has been reCewing land use and transportation alternatives for several areas of the city. RLK <br />Associates ~d BIKO Associates have been assisting the Commission in a process that began <br />with a review of previous planning documents in January 1994. A subcommittee of the <br />Planning Cc}mmission was formed and land use and transportation alternatives were discussed <br />pertaining t(~ the City in general and the Hwy. 10 corridor specifically <br /> <br />Between January and March the consultants worked with the subcommittee on alternative land <br />use scenarios, transportation corridors, and potential bridge locations. The subcommittee met <br />with the consultants and City staffon a monthly basis and the results of the study were <br />presented to the fuIl Planning Commission on April 2I, 1994. The Commission requested <br />modificatioris to the alternatives and a second review prior to forwarding any recommendations <br />to the City Council. <br /> <br />On May 19 the Planning Commission reviewed the land use and transportation alternative <br />scenarios for a second time. The Commission then directed the consultants to prepare a final <br />set of alternatives and recommendations to be presented at a joint meeting of the Commission <br />and City CoUncil. The Commission also directed staff and the consultants to confer further <br />and, if desired, prepare an additional alternative to reflect any issues that stafffelt may require <br />further attention. '~'" <br /> <br />This report e, omprises the eight alternatives that have evolved out of the planning process. <br />These alterntatives are intended to form the foundation of amendments to the City of Ramsey <br />Comprehensive Plan. <br /> <br />Alternatives [recommended to the City Council by the Planning Commission include: <br /> <br />Figure 1 <br />Figure 2, option C <br />Figure 3 <br />Figure 7 <br /> <br />Each of these recommended alternatives are explained further in this report. The other <br />alternatives for the Hwy. 10 corridor-Figures 4, 5, and 6:-,are not recommended by the <br />Planning Commission. They are presented and explained in this document to provide <br />background information. ". <br /> <br />7 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.