Laserfiche WebLink
Option A <br /> <br />Description <br /> <br />1, <br /> <br />2. <br /> <br />3, <br /> <br />Police expal~ds to City Hall on the upper and lower levels. <br /> <br />Fire Stationlexpands to City Hall on the lower level. <br /> <br />New Public Works Facility located on the municipal site east of City Hall. <br /> <br />Advantages <br />1. <br /> <br />e <br /> <br />Efficient and functional Police addition with Police operations on the u'pper <br />level and the squad garage and evidence/property storage on the lower tevel. <br /> <br />Optimum public service location for the Police Department on the upper level <br />of City Hall. <br /> <br />Both the Po!ice and Fire Station additions can be accomplished with minimal <br />disruption tO City Hall. <br /> <br />Relocation of Planning, Engineering, and Inspections to the Public Works <br />Facility will ~ree-up area in lower level City Hall for conference and meeting <br />space. <br /> <br />Land use and site size will accommodate Public Works in a new facility and <br />provide ade~quate vehicle and equipment storage, maintenance, and support <br />areas, <br /> <br />Site plan colncept provides access to Public Works administration on the same <br />axis as the City Hall lobby. The vehicular activity, fueling, and outside storage <br />are screened from view from the general entering City Hall. <br /> <br />Site plan copcept locates all facility development to the south half of the site, <br />allowing greater potential future development.in the northern quadrants <br /> <br />Disadvantages <br /> <br />The relocation of Planning, Engineering, and Inspections to the Public Works <br />facility lessens the proximity to other City Hall departments and access to the <br />public. <br /> <br />The site de~iign concept as it relates to the Public Works facility represents <br />significant ~ite development costs for'excavatiOn.and grading. <br /> <br />Z <br /> <br /> <br />