Project. <br /> <br />167th Cmsstown <br /> <br />2OOO <br />Past - <br />2000 <br /> <br />$100,000 - MSA <br />$ 700,000 - MSA <br /> <br />$ 800,000 <br /> <br />S-7 - Street Paving and Maintenance Programs <br /> <br />Each year the street program consists of crack repair, sealcoating and occasional overlays of <br />municipal paved?roads. These projects are conducted with the City General Tax levy subsidizing <br />some project co~s with the primary funder being the benefitted property owner. Additionally, the <br />City has identifigd a need to cause all of the unpaved road surfaces to be paved in the near term. <br />Contemplated was an intensive three year program to ensure that the bulk of these road surfaces are <br />paved. It was ~xpected that the General Fund experience costs to fund unique expenses or <br />portions demongrating hardship. This program has been dropped from the plan at this point and <br />remains here as a future consideration. <br /> <br />Project Year Funding <br /> <br />Street Paving Program <br /> <br />Past - <br />2000 <br /> <br />$ 210,000 - Assessment <br /> <br />Street Maintenance Program Annual <br /> <br />$100,000- Assessment <br />$100,000 ~ General Fund <br /> <br /> $ 200,000 <br /> Annual Program <br /> <br />S-8 - Ramsey/Dayton Bridge <br /> <br />For a number of?ears metro agencies and area cities have been searching for a Mississippi River <br />crossing northw{st of the T.H. 610 bridge in Brooklyn Park/Coon Rapids and southeast of the <br />T.H. 101 in Elk River [in addition to the existing Anoka/Champlin bridge at T.H. 169 and'Ferry <br />Street]. Since th[e late 1980% the alignment of choice was in Ramsey halfway between County <br />Roads #56 and ~,83 aligning with an extension of Hennepin County Road #121 in Dayton. The <br />alignment is currently under review in both Ramsey and Dayton to the south. Once this alignment <br />is chosen [expect. ed during 1995] Ramsey should be prepared to acquire right-of-way, if need be, <br />to ensure a state ~f readiness when funding for the roadway/bridge becomes closer to reality and to <br />set aside the corri~dor to ensure it is not inappropriately developed. <br /> <br /> project Year Funding <br /> <br />ROW Acquisition <br /> <br />2000 $ 50,000- MSA <br /> <br />$ 50,000 <br /> <br /> <br />