My WebLink
|
Help
|
About
|
Sign Out
Home
02/01/94 Special Meeting
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Board of Adjustment
>
Agendas
>
1990's
>
1994
>
02/01/94 Special Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2025 1:48:50 PM
Creation date
10/21/2003 2:27:59 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Board of Adjustment - Special
Document Date
02/01/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REVIEW TERMS <br /> <br /> CASE <br /> <br />OF VARIANCE GRANTED TO MR. JAMES McCHESNEY <br />By: Zoning Administrator Sylvia Frolik <br /> <br />Background: <br /> <br />As you may r~-4gall, on September 7, 1993, the Board of Adjustment granted Mr. James <br />McChesney a v0giance to construct an accessory structure nearer the front property line than the <br />principal structure at 15429 Sunfish Lake Blvd. N.W. During the discussion of the variance, there <br />was some disput~ as to the location of the common property line between Mr. McChesney and his <br />neighbor to the siouth. Consequently, the Board also granted a 5 foot variance to the 10 foot side <br />yard setback on/he south property line. <br /> <br />Observations:~ <br /> <br />Upon having th~ property surveyed, it has been determined that one comer of the accessory <br />structure will be[4.5 feet from the side property line and the other corner is 3 feet from the side <br />property 1inc. Id accordance with the instructions of the Board of Adjustment, Mr. McChesney is <br />coming back fo~ direction as to how to proceed because the 5 foot side yard variance is not <br />sufficient to address the structure location. Normally, it would not be a problem to relocate a <br />proposed structt/re but in this case, the accessory structure is a rebuild of a former structure and <br />consequently a sfibstantial amount of framing is already in place. <br /> <br />On January 4, 2994, the Planning Commission scheduled a special meeting of the Board of <br />Adjustment for l~ebruary 1 to resolve this situation. <br /> <br />The following itaras are enclosed for your information: <br /> <br />a) <br />b) <br />c) <br />d) <br /> <br />Site location map <br />BPard of Adjustment public hearing and regqalar meeting minutes dated 9/7/93 <br />Variance <br />Property survey <br /> <br />Recommendatlon: <br /> <br />Board Action: <br /> <br />Will be based on your discussion. <br /> <br />Review Checklist: <br />BoA: <br /> <br />Zoning Administrator <br />2/1/94 <br /> <br />/ <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.