Laserfiche WebLink
PARKS AND UTILITIES TASK REPORT <br /> <br />Significant Parl~ Occurrences <br /> <br />· Formed and p0,ured 9.5 yards of concrete in River's Bend Park shelter. <br /> <br />· Developed and;constructed method to leave the fishing pier in place over winter. <br /> <br />· Prepared berm for garden club beautification project. <br /> <br />· Repaired athlet|c field lights at Central Park. <br /> <br />· Soccer and football field striping concludes for 1994. <br /> <br />· Lake Itasca trail shouldered with Anoka High School volunteers and part-time staff. <br /> <br />· Central Park i~igation system winterized. <br /> <br />· Trail system at Central Park shouldered and seeded. <br /> <br />Significant <br /> <br /> Utili~ty Occurrences <br /> City Staff assists with watennain extension for Ramsey Athletic Club and Detail Tool. <br />· Prepared distribution system leak within the pumphouse. <br />· Flow tested hydrants and perforated acceptance inspection in Chestnut Ridge. <br />· Annual mainteriance of lift station performed. <br />· Watermain and:approximately 150 hydrants flushed. <br />· Municipal water extension to Sharp property tested for fire flow. <br />· Eleven water meters installed. <br /> <br />/~cr <br /> <br /> <br />