Laserfiche WebLink
Quanities Oones By: t MAK <br />Date: ~ 3/21/2003 <br />Entered By: : MAK <br />Date: ~. 3/21/2003 <br /> <br />Revisions: r <br />Updated with SJ Louis con~act #$ 4/'I 1/2003 <br /> 3rd Addition <br />Wildlife <br /> <br />Engineer's Estin~ate of City Reimbersement for 18" Trunk Line <br /> UNIT <br /> <br />ITEM ; UNIT PRICE <br /> <br />Connect to Exi,sting L~. w/1'8" Trunk Main Each $1,500.00 <br />18" PVC 16-18 Deepl- SDR 26 L.F. $50.00 <br />18" PVC 15-20' Deep~ SDR 26 L.F. $55.00 <br />18" Plug Each $110.00 <br />Dewatering * L.S.''~, $2,475.00 <br />Tree Clearing/Restoration L.S. $5,639.75 <br /> <br />QUANTITY <br /> <br />AMOUNT <br /> <br />1 $1,500.00 <br />293 $14,650.00 <br />185 $10,175.00 <br />1 $110.00 <br />t $4,950~00 <br />1 $4,950.00 <br /> <br />Subtotal <br /> <br />$36,335.00J <br /> <br />* . Dewatering CalCulation <br />Total Length of Pipe=~900 fl <br />Total Length of 18" T/bnk Line = 478 ft <br />Total Dewatering Cos~-$30,000 <br />% of Total is 18" Trun~ Line = 16.5% <br />Total Cost of Dewater~ng due to Trunk Line = $ 4, 950 <br /> <br />-191- <br /> <br /> <br />