My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/28/2003
Ramsey
>
Public
>
Agendas
>
Council
>
2003
>
Agenda - Council - 10/28/2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 3:56:06 PM
Creation date
10/24/2003 3:09:14 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/28/2003
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12. <br /> <br />13. <br /> <br />c) F ature though street signs <br />d) S [met lights <br />e) S ireet light maintenance and operation <br />f) S ~alcoating <br />g) Skeet sweeping <br />h) %~.'~ j usting water shut-off boxes <br />i) Maintenance of storm water and facilities <br />j) E~ ulevard seeding <br /> <br /> ("Stage I~ Improvements") <br /> <br />Payment fop Stage II Improvements. The CITY will install in the Plat the Stage II <br />Improvements. The DEVELOPER shall also deposit an amount that is determined by the <br />CITY to beiadequate to aid in the operation and maintenance of street lights in locations <br />within the P~at determined by the City ~ngineer and installed by Connexus for the fu:st three <br />(3) years aft{r final plat approval. The ~ITY will bill residents in the Plat at least quarterly <br />for street li~[~ht maintenance and operation costs; billing will be initiated at the time a <br />residence co~nects to municipal water and Sanitary sewer. The DEVELOPER will pay to <br />the CITY a~ amount equal to 100% of the City Engineer's e,stimated construction cost of the <br />items prior, recording of the final Plat. The City Engineer s estimated cost of construction <br />1S~ ; <br /> <br />Street Str/pi~g and Signing (1 ~ $200 each) <br />Traffic signi~ag (0 ~ $200 each) <br />Future through street signs (2 ~, $200 each) <br />Street lights ! (13 ~ $1,700 each) <br />Street light ~aintenance & operation for 3 yrs (13 x $270) <br />Sealcoating[ (10,350 sq. yds. @ 0.90/sq. yd.) <br />Street swee ,p'~ng <br />Adjusting w{ter shut-off boxes <br />Maintenanc{ of storm water and facilities <br /> [ . <br />Boulevard sa,.ed~ng <br /> <br />TOTAL <br /> <br />$200.00 <br />$0 <br />$400.00 <br />$22,100.00 <br />$3,510.00 <br />$9,315.00 <br />$300.00 <br />No charge <br />No Charge <br />No Charge <br />$35,825.00 <br /> <br />Hard Surf4ced Driveways. Hard surfaced (bituminous or concrete) driveways are a <br />requirement ifor each lot in the Plat, including the existing homestead on Lot 13, Block 4. <br />Said improv[ment shall be installed by the building permit applicant or the homeowner at the <br />time the Ce nificate of Occupancy is issued or as soon thereafter as possible, weather <br /> <br />permitting. <br />and/or the D <br />the lot and <br />waives all ri <br />property <br />assessment <br />grants the C'. <br /> <br />the event this improvement is not timely installed on a lot, the DEVELOPER <br />EVELOPER'S assign(s), agree that the CITY may install said improvement on <br />pecially assess the cost therefore against the lot. The DEVELOPER hereby <br />;hts to a public heating and other statutory fights or City Charter fights wanted a <br />~er relating to special assessments, including the right to appeal the special <br />installation of the hard surfaced driveway. In addition, the DEVELOPER <br />[TY a license to enter on each lot of the Plat in order to install the improvement <br /> <br />described in ~his paragraph if the same has not been previously constructed. <br /> Development Agreement/Wildlife Sanctuary 3~ Addition <br /> Page 5 of 12 <br /> <br /> t <br /> <br />-t99= <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.