Laserfiche WebLink
FC# [ <br /> <br />AUTHi <br /> <br />}RIZE REMAINING 2003 PARKS CAPITAL IMPROVEMENTS <br /> By: Mark Riverblood, Parks/Utilities Supervisor <br /> <br />Background: , <br /> <br />As part of the 2003, Parks Capital Improvements Program (CIP), irrigation and two shelters were <br />proposed for Flinkwood Terrace Park as well as an~important trail connection to the existing Lake <br />Itasca Trail. ~ <br /> <br />At their regular iSeptember meeting, the Park Commission recommended that City Council <br />proceed with both projects. <br /> <br />Observations: ' <br /> <br />Both of the abov~ CIP worksheets are enclosed. <br />maintenance cost~: <br /> <br />The information below also references annual ' <br /> <br />Flintwood Terra~ Park <br /> <br />This project would entail irrigating the entrance along 142"d Avenue and around the playground <br />area. To the nor}h of the playground would be a hexagonal shelter. Another shelter would be <br />placed at the sot~th side of the "lake" west of the Ponds Subdivision. This would serve both <br />picnickers and tr}il users. The total cost for two hexagonal shelters meeting city specifications, <br />with concrete, i~lstallation and tax is approximately $58,000. The irrigation element with <br />connection to th~municipal system would require the remaining $17,000 of the $75,000 project. <br />Staff is seeking ~thorization to proceed with designing the irrigation system and then bringing <br />back quotes for tlje entire project for spring installation. <br /> <br />Annual/zed Nak~tenance expenses: The annual maintenance needs of one open air <br />picnic shelter a~e estimated at .5 hours x 18 weeks of active use, or 9 hours (.004 <br />FTE's) of ordina~ry maintenance specific to the shelter each year. However, reshingling <br />will be required[every 20 - 25 years. <br /> <br />The irrigation sy. stem requires more of an investment. The annual operating cost for an <br />irrigation syste~ as proposed is approximately $1,530 per acre. This includes water, <br />electricity, repots and maintenance such as winterization. This project should be <br />considered to c{)st about $1,500 to $2,000 per year to operate. <br /> <br />-209- <br /> <br /> <br />