Laserfiche WebLink
Reconstruction with utilities <br />Total Project Cost <br />Street Total <br />Sewer & Water Total <br />Storm Total <br />Proposed Assessment <br />$ 714, 314.25 <br />$ 342, 065.75 <br />$ 325, 747.50 <br />$ 46, 501.00 <br />$ 13,156.38 <br />Includes 30% overhead <br />Storm improvements to be paid through the stormwater utility fund <br />* Assumes 13 assessable parcels, and a 50% contribution from the City for the street improvement (including necessary subgrade corrections). <br />** <br />This does not include any costs associated with utility installation. <br />Trunk and lateral benefit fees for sanitary sewer & water would apply if/when they decide to connect to the municipal system. <br />2012 water fees/lot $ 11,003.00 <br />2012 sanitary fees/lot $ 5,118.00 <br />$ 16,121.00 Total connection charges/lot <br />