Laserfiche WebLink
x uo.R <br />January 11, 2012 <br />John Lewis <br />Knutson Construction Company <br />5500 Wayzata Blvd, #300 <br />Golden Valley, MN 55416 <br />Dear John: <br />Zl <br />Ramsey Parking Facility Phase II <br />7650 Sunwood Dr NW <br />Ramsey, MN 55303 <br />We propose to supply labor and material for the fixture options as follows. <br />NEW PARKING RAMP / <br />Lot Change light fixture on parking ramp ceiling to florescent vapor tight t5 lamps <br />in new ramp, along with the previously specified light poles , wall sconce and <br />exit lighting <br />EXISTING PARKING RAMP <br />Lot Change Tight fixture on parking ramp ceiling to florescent vapor tight t5 lamps <br />in new ramp along with wall sconce fixtures <br />For the Cost of $34,730.00 <br />The additional cost to add a reflector to this fixture is $7,150.00 <br />There is a quanity of 201 fixtures located in the original ramp and 86 in the new ramp. <br />The cost breakout to change the new ramp fixture to the t-5 with reflector is a deduct of <br />$3,118.00. <br />Sincerely, <br />Allan D. Holm <br />knutson rarnsey parking ramp 15 option <br />7224 Wtnnetk Ave. I., Minneapolis, MN -1 <br />(63) 537-9357 fax (763) 7w 3 9 <br />www,mayerelec,com <br />