My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 01/17/2012
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2012
>
Agenda - Public Works Committee - 01/17/2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 10:19:30 AM
Creation date
1/13/2012 4:31:32 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
01/17/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Connexus rebates <br />Option 1: Stay with current lighting fixture (No rebates) <br />Existing ramp # of fixtures per fixture <br />100W Metal halides <br />201 0 = <br />$ <br />Expansion ramp <br />100W Metal halides 86 0 = $ <br />Option 2: Change design to include flourescent in ramp expansion but leave existing ramp alone <br />Existing ramp # of fixtures per fixture <br />100W Metal halides <br />201 $ - = $ <br />Expansion ramp <br />Two 52 W T5 flourescent 86 $ 2.20 = $ 189.20 <br />$ 189.20 <br />Option 3: Change design of new ramp and retrofit existing ramp <br />Existing ramp # of fixtures per fixture <br />Two 52 W T5 flourescent 201 $ 13.00 = $ 2,613.00 <br />Expansion ramp <br />Two 52 W T5 flourescent 86 $ 2.20 = $ 189.20 <br />Total rebate = <br />Total Cost Analysis <br />Option 1: Stay with current lighting fixture (included in Contract) <br />Existing ramp # of fixtures per fixture <br />100W Metal halides <br />Expansion ramp <br />100W Metal halides <br />$ 2,802.20 <br />201 0 = $ <br />86 0 = $ <br />Total change order = $ <br />Option 2: Change design to include flourescent in ramp expansion but leave existing ramp alone <br />Existing ramp # of fixtures per fixture <br />100W Metal halides <br />201 $ - = $ <br />Expansion ramp <br />Two 52 W T5 flourescent 86 $ (29.77) = $ (2,560.00) <br />Total change order = <br />Connexus rebate = <br />Total Cost w rebate = <br />Option 3: Change design of new ramp and retrofit existing ramp <br />Existing ramp # of fixtures per fixture <br />Two 52 W T5 flourescent 201 $ 247.32 = $ 49,711.00 <br />Expansion ramp <br />Two 52 W T5 flourescent 86 $ (29.77) = $ (2,560.00) <br />Total change order = <br />Connexus rebate = <br />Total Cost w rebate = <br />$ (2,560.00) <br />$ 189.20 <br />$ (2,749.20) <br />$ 47,151.00 <br />$ 2,802.20 <br />$ 44,348.80 <br />
The URL can be used to link to this page
Your browser does not support the video tag.