My WebLink
|
Help
|
About
|
Sign Out
Home
Resolution - #06-10-337 - Draft - 10/24/2006
Ramsey
>
Public
>
Resolutions
>
2006
>
Resolution - #06-10-337 - Draft - 10/24/2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 10:21:32 AM
Creation date
1/18/2012 10:47:20 AM
Metadata
Fields
Template:
Resolutions & Ordinances
Resolutions or Ordinances
Resolutions
Resolution or Ordinance Number
#06-10-337 - Draft
Document Date
10/24/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Background: <br />At the May 9, 2006 City Council meeting staff was directed to prepare plans and <br />specifications for the replacement of the Ermine Boulevard culvert which is located <br />approximately 200 feet west of Eaton Street. The location of this project is illustrated on <br />the attached figure. This culvert carries flow from a tributary of Trott Brook and currently <br />has open joints which are causing the loss of material from beneath the roadway. The <br />project will also rectify a floodplain issue which was brought to the City's attention by <br />FEMA. The project will consist of replacing the existing 72 inch culvert with two 60 foot <br />long 10ft x 7ft box culverts that would allow the floodway to be revised so that the entire <br />100 year flood would be carried through the culvert and would no longer overtop Ermine <br />Boulevard as is currently predicted by the storm water model.. <br />The estimated construction cost is between $120,000 and $140,000. Proposals for this <br />work were received from Hakanson Anderson Associates and Bolton & Menk Inc. <br />Copies of these two letter proposals are attached. The Hakanson Anderson proposal <br />estimates for project services is $51,800 which is between 37% and 43% of the <br />construction cost. The Bolton & Menk proposal is for a not to exceed cost of $38,500 <br />which is between 28% and 32% of the construction cost. Funding for this project would <br />be from the Storm Water Utility. <br />Recommendation: <br />Staff recommends award of engineering services for the Ermine Street culvert project to <br />Bolton & Menk Inc. in accordance with their letter proposal dated October 17, 2006. <br />Action: <br />CONSIDER PROPOSAL FOR ENGINEERING SERVICES FOR THE <br />REPLACEMENT OF THE ERMINE BOULEVARD CULVERT <br />By: Steven Jankowski, City Engineer <br />Reviewed By: <br />Public Works Director/Principal Engineer <br />CC: 10/24/06 <br />CASE # S <br />Motion to award of engineering services for the Ermine Street culvert project to Bolton & <br />Menk Inc. in accordance with their letter proposal dated October 17, 2006. <br />-235- <br />
The URL can be used to link to this page
Your browser does not support the video tag.