Laserfiche WebLink
OPINION OF PROBABLE COST <br />CSAH 83 (ARMSTRONG BLVD) AT SUNWOOD DR <br />WSB Project: CSAH 83 at Sunwood Dr <br />Project Location: Ramsey, MN <br />WSB Project No: 01973-010 <br />ITEM <br />NUMBER <br />DESCRIPTION <br />UNIT <br />Unit <br />Price <br />PROJECT <br />TOTAL <br />ESTIMATED <br />QUANTITY <br />Estimated <br />Cost <br />WATER MAIN IMPROVEMENTS <br />2504.602 <br />CONNECT TO EXISTING WATER MAIN <br />EACH <br />$850.00 <br />1 <br />$850.00 <br />2504.602 <br />HYDRANT <br />EACH <br />$3,300.00 <br />2 <br />$6,600.00 <br />2504.602 <br />ADJUST VALVE BOX -WATER <br />EACH <br />$250.00 <br />4 <br />$1,000.00 <br />2504.602 <br />6" GATE VALVE AND BOX <br />EACH <br />$1,200.00 <br />2 <br />$2,400.00 <br />2504.602 <br />12" GATE VALVE AND BOX <br />EACH <br />$2,500.00 <br />2 <br />$5,000.00 <br />2504.603 <br />6" WATER MAIN -DUCT IRON CL 52 <br />LIN FT <br />$45.00 <br />60 <br />$2,700.00 <br />2504.603 <br />12" WATER MAIN -DUCT IRON RESTRND JT <br />LIN FT <br />$62.00 <br />145 <br />$8,990.00 <br />2504.603 <br />12" WATER MAIN -DUCT IRON CL 52 <br />LIN FT <br />$50.00 <br />550 <br />$27,500.00 <br />2504.603 <br />24" STEEL CASING PIPE <br />LIN FT <br />$140.00 <br />145 <br />$20,300.00 <br />2504.608 <br />DUCTILE IRON FITTINGS <br />POUND <br />$3.00 <br />1700 <br />$5,100.00 <br />Total Storm Sewer Improvements <br />$80,440.00 <br />plus 10% Contingencies <br />$8,044.00 <br />Total Storm Sewer Construction Cost <br />$88,484.00 <br />plus 21%Admin, Legal Etc <br />$18,581.64 <br />Total Water Main Cost <br />$107,065.64 <br />Grand Total <br />$1,749,715.83 <br />Preliminary Cost Estimate - Armstrong at Sunwood Report - 12-8.xls 4 12/8/2011 <br />