Laserfiche WebLink
Storm Sewer Cost Estimates <br />Project: Sunwood Drive Realignment <br />Ramsey, MN <br />RAMSEY, MINNESOTA <br />• • <br />• • <br />LANDFORM <br />• • <br />From Site to Finish <br />Item No. <br />Item <br />Units <br />Quantity <br />Unit Price <br />Total Price <br />2104.509 <br />Remove Storm Sewer Structure <br />EACH <br />1 <br />$500.00 <br />$500.00 <br />2503.541 <br />15" RC Pipe Sewer DES 3006 CL V <br />LF <br />274 <br />$27.00 <br />$7,398.00 <br />2503.541 <br />18" RC Pipe Sewer DES 3006 CL III <br />LF <br />287 <br />$28.00 <br />$8,036.00 <br />2503.541 <br />21" RC Pipe Sewer DES 3006 CL III <br />LF <br />184 <br />$32.00 <br />$5,888.00 <br />2503.541 <br />24" RC Pipe Sewer DES 3006 CL III <br />LF <br />30 <br />$38.00 <br />$1,140.00 <br />2503.541 <br />27" RC Pipe Sewer DES 3006 CL III <br />LF <br />231 <br />$45.00 <br />$10,395.00 <br />2503.602 <br />Connect To Existing Storm Sewer <br />EACH <br />1 <br />$500.00 <br />$500.00 <br />2506.501 <br />48" Diameter Catch Basin Neenah Casting R-3067 <br />EACH <br />10 <br />$1,500.00 <br />$15,000.00 <br />2506.501 <br />Catch Basin Neenah Casting R-3067 - Special <br />EACH <br />1 <br />$12,000.00 <br />$12,000.00 <br />2573.530 <br />Storm Drain Inlet Protection Type C <br />EACH <br />12 <br />$350.00 <br />$4,200.00 <br />$65,057.00 <br />10% Contingency: <br />$6,505.70 <br />Subtotal: <br />$71,562.70 <br />21 % Indirect Costs: <br />$15,028.17 <br />Storm Sewer Estimated Cost: <br />$86,590.87 <br />Summary <br />Total Price <br />Street Work Estimated Cost: <br />$1,151,547.66 <br />Watermain Estimated Cost: <br />$130,837.30 <br />Storm Sewer Estimated Cost: <br />$86,590.87 <br />Total Estimated Cost: <br />$1,368,975.83 <br />