Laserfiche WebLink
Council Action: <br />Motion to approve the feasibility studies for the Sunwood realignment project, consistent with the chosen financing <br />package. <br />- and - <br />Motion to award engineering design contracts in an amount not to exceed $220,012. <br />- and - <br />Motion to authorize the preparation of plans and specifications. <br />Sunwood Preliminary Layout <br />Armstrong Preliminary Layout <br />WSB Draft Feasibility Study <br />Landform Draft Feasibility Study <br />Funding Scenarios <br />Landform Design Proposal <br />WSB Design Proposal <br />Attachments <br />Form Review <br />Inbox Reviewed By Date <br />Kurt Ulrich Kurt Ulrich 01/19/2012 03:56 PM <br />Form Started By: Tim Himmer Started On: 01/17/2012 01:28 PM <br />Final Approval Date: 01/19/2012 <br />