My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 01/24/2012
Ramsey
>
Public
>
Agendas
>
Council
>
2012
>
Agenda - Council - 01/24/2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 12:05:08 PM
Creation date
1/19/2012 5:14:47 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
01/24/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WSB Project: CSAH 83 at Sunwood Dr <br />Project Location: Ramsey, MN <br />WSB Project No: 01973 -010 <br />OPINION OF PROBABLE COST <br />CSAH 83 (ARMSTRONG BLVD) AT SUNWOOD DR <br />Grand Total <br />$1,749,715.83 <br />Preliminary Cost Estimate - Armstrong at Sunwood Report - 12 -8.xls 4 12/8/2011 <br />ITEM <br />NUMBER <br />DESCRIPTION <br />UNIT <br />Unit <br />Price <br />PROJECT <br />TOTAL <br />ESTIMATED <br />QUANTITY <br />Estimated <br />Cost <br />WATER MAIN IMPROVEMENTS <br />2504.602 <br />CONNECT TO EXISTING WATER MAIN <br />EACH <br />$850.00 <br />1 <br />$850.00 <br />2504.602 <br />HYDRANT <br />EACH <br />$3,300.00 <br />2 <br />$6,600.00 <br />2504.602 <br />ADJUST VALVE BOX -WATER <br />EACH <br />$250.00 <br />4 <br />$1,000.00 <br />2504.602 <br />6" GATE VALVE AND BOX <br />EACH <br />$1,200.00 <br />2 <br />$2,400.00 <br />2504.602 <br />12" GATE VALVE AND BOX <br />EACH <br />$2,500.00 <br />2 <br />$5,000.00 <br />2504.603 <br />6" WATER MAIN -DUCT IRON CL 52 <br />LIN FT <br />$45.00 <br />60 <br />$2,700.00 <br />2504.603 <br />12" WATER MAIN -DUCT IRON RESTRND JT <br />LIN FT <br />$62.00 <br />145 <br />$8,990.00 <br />2504.603 <br />12" WATER MAIN -DUCT IRON CL 52 <br />LIN FT <br />$50.00 <br />550 <br />$27,500.00 <br />2504.603 <br />24" STEEL CASING PIPE <br />LIN FT <br />$140.00 <br />145 <br />$20,300.00 <br />2504.608 <br />DUCTILE IRON FITTINGS <br />POUND <br />$3.00 <br />1700 <br />$5,100.00 <br />Total Storm Sewer Improvements <br />$80,440.00 <br />plus 10% Contingencies <br />$8,044.00 <br />Total Storm Sewer Construction Cost <br />$88,484.00 <br />plus 21 %Admin, Legal Etc <br />$18,581.64 <br />Total Water Main Cost <br />$107,065.64 <br />WSB Project: CSAH 83 at Sunwood Dr <br />Project Location: Ramsey, MN <br />WSB Project No: 01973 -010 <br />OPINION OF PROBABLE COST <br />CSAH 83 (ARMSTRONG BLVD) AT SUNWOOD DR <br />Grand Total <br />$1,749,715.83 <br />Preliminary Cost Estimate - Armstrong at Sunwood Report - 12 -8.xls 4 12/8/2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.