Laserfiche WebLink
Figure 4: Project Layout Map <br />THE <br />41, <br />SUNWOOD DRIVE <br />EXISTING SUNWOOD DRIVE <br />(TO BE REMOVED) <br />FUTURE R,qMSEC <br />s. <br />1 <br />I 1 <br />LEGEND <br />PAVED ROADWAY <br />CONCRETE WALK <br />CONCRETE MEDWN <br />LANDSCAPE FEATURE AREA <br />- - - PROPOSED RO:W. <br />PAVED ROADWAY( <br />BEGIN REALIGNMENT <br />Under the proposed realignment, Sunwood Drive turns north at a point approximately <br />700 feet east of its current intersection with Armstrong Boulevard. Sunwood Drive <br />continues northward to its intersection with the future Ramsey Parkway. At this <br />proposed roundabout intersection Sunwood Drive turns west to connect with <br />Armstrong Boulevard. Improvements to the new Armstrong /Sunwood intersection are <br />described in a separate preliminary engineering report by WSB & Associates, Inc. The <br />preparation of both reports was coordinated to provide an overall plan for the needed <br />improvements. <br />City of Ramsey <br />Sunwood Drive <br />L A N D F O R M <br />Project No. RAM11008 <br />Page 6 <br />