My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 01/24/2012
Ramsey
>
Public
>
Agendas
>
Council
>
2012
>
Agenda - Council - 01/24/2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 12:05:08 PM
Creation date
1/19/2012 5:14:47 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
01/24/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Peak Hour <br />Analysis <br />Condition <br />Overall Intersection <br />Level of Service <br />Average Delay By Approach <br />SB - Driveway <br />EB - Sunwood Dr. <br />NB - Sunwood Dr. <br />WE - Ramsey Pkwy <br />Level of <br />Service <br />Average <br />Delay <br />Level of <br />Service <br />Average <br />Delay <br />Level of <br />Service <br />Average <br />Delay <br />Level of <br />Service <br />Average <br />Delay <br />Level of <br />Service <br />Average <br />Delay <br />AM <br />Calibrated <br />A. <br />4.4 <br />A <br />4.2 <br />A <br />3.8 <br />A <br />4.7 <br />A <br />4.6 <br />PM <br />Calibrated <br />A <br />6.9 <br />A <br />6.6 <br />A. <br />4.7 <br />A <br />8.5 <br />A <br />6.8 <br />Analysis of residual capacity for future traffic growth was also performed for the intersection. <br />Residual capacity is expressed as the percentage increase in total entering traffic beyond the existing <br />turning counts that would result in any individual leg operating at LOS E (delay greater than 35 <br />seconds). Increases in traffic flow were assumed to occur equally on all legs until one leg reached <br />LOS E <br />The 2030 AM and PM peak hourly traffic forecasts prepared by Spack Consulting, as illustrated in <br />Figure 1, were used for this analysis. <br />OPERATIONAL ANALYSIS RESULTS <br />Ramsey Parkway and Sunwood Drive (ARCADY Analysis) <br />LOS for proposed initial roundabout configuration <br />The operational analysis was performed with the traffic forecasts provided for the interim lane <br />configuration shown in Figure 2. The overall intersection levels of service and anticipated delay with <br />a break down by approach are listed in Table 1. <br />Table 1. Ramsey Parkway & Sunwood Drive — Proposed Initial Lane Configuration <br />LOS Source. 2010 Highway Capacity Manual - linsignalrzed intersect o;s <br />The eastbound Sunwood Drive predicted 95 percentile queue is 1 vehicles (20 feet) in the PM peak <br />period. <br />The residual capacity for the AM and PM peak hours is also listed below. <br />AM: NB congests with a 159% increase in traffic growth above the 2030 <br />traffic volumes. <br />PM: NB congests with a 39% increase in traffic growth above the 2030 <br />traffic volumes. <br />The ARCADY operational analysis data is documented in Appendix A, pages A.1.1 thru A.1.3 <br />LOS for potential ultimate roundabout configuration <br />The operational analysis was performed with the traffic forecasts provided for the ultimate lane <br />configuration shown in Figure 3. The overall intersection levels of service and anticipated delay with <br />a break down by approach are listed in Table2. <br />Ourston <br />Roundabout <br />Engineering <br />Operational Analysis <br />Ramsey Parkway & Sunwood Drive <br />Ramsey, Minnesota <br />Seconds <br />Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.