Laserfiche WebLink
Project: Riverdale Drive Improvements <br />Project Location: Ramsey, MN <br />ITEM NUMBER <br />2 J21 .sJ1 <br />21 J1 J1 <br />2105.509 <br />2,10 Ir <br />251, J1 <br />2575 .51 <br />25S2. 501 <br />25S2 J1 <br />25S2. 502 <br />25S2. 502 <br />25S2. 502 <br />Des crip <br />CLEARING <br />CLEARING <br />GRUBBING <br />GRUBBING <br />GRA <br />TYPE SP 12.5 ARI0IG 1 <br />TYPE SP 12.5 N..P WEAR COURSE Prx (s Ri <br />PORTABLE PRECAST C7.01C BARRIER DES SS, <br />RE17:CATE 7,RT PRECAST C7.01C BAR DES SS, <br />GUIDE PC,T TYPE B <br />TRAFFIC CCNTROL <br />SIGN PANE, Tyre c <br />;ELI FENCE TYPE rACHINE SIICED <br />FERTILIZER TYPE 2 <br />HL <br />HL <br />ACRE <br />TREE <br />ACRE <br />TREE <br />EACH <br />1IN FT <br />ITN FT <br />ITN FT <br />EACH <br />AEBY <br />EACH <br />1IN FT <br />ACRE <br />EACH <br />EACH <br />ITN FT <br />ITN FT <br />UNIT PRICE <br />Project <br />Total <br />ESTIMATED N <br />52:11 <br />is <br />121 J <br />ESTIMATED COST <br />5,152.50 <br />$1,52. <br />PERCENT <br />MnDOT Cost Share <br />ESTIMATED COST <br />$11,550.00 <br />$1,520.00 <br />Comment <br />'ROADWAY SODTOTA <br />$1,018,078.00 $770,827.80 <br />20% CONTINGENCY <br />$203,615.60 $154,165.56 <br />AWAY TOTAL $1,221,693.60 444 ,993 3 9 r u <br />a anDOT Max i6 71.1% per ontage roan access ratio oalo <br />71.1% $868,624.15 <br />COOPERATIVE AGREEMENT GRANT AMOUNT - CONST <br />- $650,000.00 - <br />REMAINING COST SUB TOT. - CONST <br />$571,693.60 $218,624.15 <br />'RIGHT -OF -WAY $150,000.00 <br />LEGAL, ADMINISTRATION, ENGINEERING $98,000.00 <br />CONSTRUCTION ENGINEERING/INSPECTION <br />$98,000.00 $ 97,735.49 <br />not greater than 8% <br />of co <br />nst costs <br />COOPERATIVE AGREEMENT GRANT AMOUNT - CONST ENG <br />r <br />-$ -$ <br />52 000 00 52,000.00 <br />REMAINING COST SUB TOT. - CONST ENG <br />$ 46,000.00 $ 45,735.49 <br />REMAINING PROJECT COST TOTALS $865,693.60 <br />TOTAL PROJECT COSTS $1,567,693.60 <br />Summary <br />$571,693.60 remaining c nstuction costs <br />$218,624.15 e ing construction costs that are eligible per MnDOT's cost participation policy <br />I don't see anywhere in the RASA guidance that they will limit the funding to eligible items per MnDOT's cost participation policy but may want <br />