My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 12/13/2011
Ramsey
>
Public
>
Agendas
>
Council
>
2011
>
Agenda - Council - 12/13/2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 2:22:47 PM
Creation date
1/31/2012 3:53:22 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
12/13/2011
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
988
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item Item Description Units Unit Price Contract Quantity to Current Amount to <br />No. Quantity Date Quantity Date <br />151 2582.502 4" DOUBLE SOLID LINE YELLOW -PAINT LIN FT $0.28 18150 8528 3678.84 $2,387.84 <br />152 2582.502 24" STOP LINE WHITE -PREFORMED THERMOPLASTIC LIN FT $18.00 240 235 0 $4,230.00 <br />153 2582.502 24" SOLID LINE YELLOW -PREFORMED THERMOPLASTIC LIN FT $8.00 1925 722 87 $5,776.00 <br />154 2582.502 4" SOLID LINE WHITE -EPDXY LIN FT $0.32 17610 19162 0 $6,131.84 <br />155 2582.502 4" BROKEN LINE WHITE -EPDXY LIN FT $0.32 550 510 0 $163.20 <br />156 2582.502 8" DOTTED LINE WHITE -EPDXY LIN FT $3.00 120 102 0 $306.00 <br />157 2582.502 4" SOLID LINE YELLOW -EPDXY LIN FT $0.33 5270 5026 0 $1,658.58 <br />158 2582.502 4" DOUBLE SOLID LINE YELLOW -EPDXY LIN FT $0.66 6810 7702 0 $5,083.32 <br />159 2582.503 CROSSWALK MARKING -PREFORMED THERMOPLASTIC SQ FT $16.00 1360 1458 0 $23,328.00 <br />Totals For Section Base Bid: $3,462,216.60 <br />Backsheet 1 <br />160 I2105.605I ERODIBLE ACRE WITHHOLDING <br />Backsheet 2 <br />161 I2105.605I ERODIBLE ACRE WITHHOLDING <br />Backsheet 3 <br />162 I2105.605I ERODIBLE ACRE WITHHOLDING <br />I ACRE I ($3,000.00) I 15.51 15.51 0 ($46,500.00) <br />Totals For Backsheet 1: ($46,500.00) <br />I ACRE I $3,000.00 I 7.751 7.751 0 $23,250.00 <br />Totals For Backsheet 2: $23,250.00 <br />I ACRE I $3,000.00 I 7.751 7.751 0 $23,250.00 <br />Totals For Backsheet 3: $23,250.00 <br />Backsheet 4 <br />169 I2360.601 I BITUMINOUS DENSITY REDUCTION I LUMP SUM I ($462.26) I 11 11 1 ($462.26) <br />Totals For Backsheet 4: ($462.26) <br />Backsheet 5 <br />170 195456 'CONCRETE CURB & GUTTER AGGREGATE GRADATION REDUCTION I LUMP SUM I ($68.21) I 11 11 1 ($68.21) <br />Totals For Backsheet 5: ($68.21) <br />Change Order 1 <br />167 2106.607 EXCAVATION - COMMON CU YD $3.30 1495 1495 0 $4,933.50 <br />168 2106.607 COMMON EMBANKMENT (CV) CU YD $3.75 1395 1395 0 $5,231.25 <br />Totals For Change Order 1: $10,164.75 <br />Work Order 1 <br />163 2105.601 DEWATERING LUMP SUM $5,966.60 1 1 0 $5,966.60 <br />164 2503.602 CONNECT TO EXISTING SANITARY SEWER EACH $750.00 2 2 0 $1,500.00 <br />165 2503.602 8" PIPE PLUG EACH $100.00 1 1 0 $100.00 <br />166 2503.603 8" PVC PIPE SEWER LIN FT $29.00 130 130 0 $3,770.00 <br />Totals For Work Order 1: $11,336.60 <br />Project Totals: $3,483,187.48 <br />Page 5 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.