|
IP 11-09; Alpine Drive Overlay Contract This Pay Application Completed to Date
<br />ITEM UNIT ! QUANTITY UNIT COST EXTENSION QTY EXTENSION 1 QTY EXTENSION
<br />MULCH MATERIAL, TYPE 1 TON 0.14 $ 1,623.50 $ 227.29 $ - 0 $ -
<br />DISK ANCHORING ACRE 0.07 $ 541.14 $ 37.88 $ 0 $ -
<br />EROSION CONTROL BLANKET, CATEGORY 2 SY 500 $ 1.79 $ 895.00 500 $ 895.00 500 $ 895.00
<br />FERTILIZER, TYPE 20-0-10 LBS 21 $ 1.08 $ 22.68 105 $ 113.40 105 $ 113.40
<br />4" DOUBLE YELLOW LINE - EPDXY LIN FT 6,165 $ - 0.67 $ 4,130.55 3908 $ 2,618.36 3,908 $ 2,618.36
<br />4" SOLID LINE WHITE - EPDXY LIN FT 12,340 $ 0.33 $ 4,072.20 8154 $ 2,690.82 8,154 $ 2,690.82
<br />24" SOLID LINE WHITE STOP BARS - EPDXY LIN FT 26 $ 14.55 $ - 378.30 23 $ 334.65 23 $ 334.65
<br />CROSS WALK -- EPDXY SY FT 120 $ 10.30 $ 1,236.00 126 $ 1,297.80 126 $ 1,297.80
<br />TOTAL $ 363,222.71 $ 373,464.46 $ 373,464.46
<br />Change Order #1
<br />Subgrade Preparation
<br />STA 40 $ 300.00 $ 12, 000.00 40 $ 12, 000.00 40 $ 12, 000.00
<br />$ 12,000.00 $ 12,000.00 $ 12,000.00
<br />Change Order #2
<br />Rip -Rap CY 21 $ 110.00 $ 2,310.00 21 $ 2,310.00 21 $ 2,310.00
<br />F&I Casting Assembly 3067v (storm) EACH 13 $ 875.00 $ 11,375.00 13 $ 11,375.00 13 $ 11,375.00
<br />Labor & Materials LS 1 $ 7,695.00 $ 7,695.00 1 $ 7,695.00 1 $ 7,695.00
<br />10% General Markup LS 1 $ 2,138.00 $ 2,138.00 1 $ 2,138.00 1 $ 2,138.00
<br />$ 23,518.00 $ 23,518.00 $ 23,518.00
<br />MSA Density Incentive/Disincentive
<br />Bituminous Base Course LS 1 $ 4,322.56 $ 4,322.56 1 $ 4,322.56 1 $ 4,322.56
<br />Bituminous Wear Course LS 1 $ 3,781.92 $ 3,781.92 1 $ 3,781.92 1 $ 3,781.92
<br />$ 8,104.48 $ 8,104.48 $ 8,104.48
<br />
|