|
Category
<br />Water Utility Improvement
<br />City of Ramsey, Minnesota
<br />Capital Improvement Program
<br />2012 thru 2016
<br />PROJECTS BY CATEGORY
<br />Includes Future Projects
<br />Project# Priority 2012 2013 2014 2015 2016 Total
<br />WM Looping: Alpine Dr. (CSAH 5 to Krypton St.)
<br />Renovate Pump House 2
<br />Complete Pump House 3
<br />The COR Bunker Lake Blvd (Armstrong - Ramsey Blvd)
<br />Water Treatment Plant Construction
<br />Watermain Looping: (Ramsey Blvd to Armstrong Blvd)
<br />1.5 MG Ground Storage Reservoir
<br />Well Rehabilitation & Pump Replacement
<br />River Pines Lift Station Water Connection
<br />Well House I Improvements
<br />Magnesium Street Watermain Looping
<br />Fire Station #1 Extension of Water
<br />Watermain Sunfish Lk Blvd
<br />Water Utility Improvement Total
<br />GRAND TOTAL
<br />04-WTR-001 6
<br />04-WTR-004 5
<br />04-WTR-005 6
<br />04-WTR-009 6 225,000
<br />04-WTR-017 6
<br />04-WTR-018 6
<br />05-WTR-004 6
<br />07-WTR-001 6
<br />08-WTR-003 6
<br />09-WTR-001 6
<br />11-WTR-002 6
<br />11-WTR-003 6
<br />12-WTR-001 6
<br />273,000
<br />2,000,000
<br />50,000 58,000
<br />30,000
<br />120,000
<br />25,000
<br />450,000 2,331,000 9,850,000
<br />450,000 2,331,000 9,850,000
<br />100,000
<br />49,000
<br />60,000
<br />9,700,000 8,700,000
<br />30,000 32,000
<br />20,000
<br />350,000
<br />8,732,000 459,000
<br />8,732,000 459,000
<br />100,000
<br />49,000
<br />60,000
<br />225,000
<br />18, 400, 000
<br />273,000
<br />2,000,000
<br />170,000
<br />20,000
<br />30,000
<br />120,000
<br />25,000
<br />350,000
<br />21, 822, 000
<br />21, 822, 000
<br />Revised 10/2011
<br />PAGE 285
<br />
|