Laserfiche WebLink
Knutson Construction Services, Inc. <br />Item <br />A <br />B <br />c <br />D <br />E <br />F <br />G <br />H <br />J <br />K <br />L <br />Estimate for: <br />Ramsey Municipal Parking Ramp Phase II <br />City Project # 10-22 <br />Change Order Request <br />Lighting Revision and Retrofit - T5 Lamps w/reflector New Ramp Only Date 1 /11 /2012 COR <br />PCO 6 <br />Labor <br />Description quantity 1 unit rate unit <br />Mayer Electric <br />Superintendent <br />Subtotal: <br />1 <br />8 <br />hr <br />92 <br />total <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />736.00 <br />0.00 <br />Material Equipment <br />rate unit total rate unit total <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />Subcontracts <br />rate unit total <br />(3118) <br />Itemized Direct Costs: <br />Labor <br />Material <br />Equipment <br />Subcontracts <br />Subtotal: <br />Other Direct Costs: <br />Small Tools/Equip C°/Q of A) <br />Safety (% of E) <br />Cleanup (% of E) <br />Total Direct Costs: <br />12% for OH&P (1 - D x 0.12) <br />8 % Fee on subs (D x 0.08) <br />1-112% for Bonds & Insurance <br />5.00% <br />0.50% <br />0.25% <br />736.00 <br />736.00 <br />0.00 <br />0.00 <br />(3,118.00) <br />(2,382.00) <br />36.80 <br />(11.91) <br />(5.96) <br />-$2,363 <br />$91 <br />-$249 <br />-$38 <br />Total Request-$2,560 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />-3118.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />-3118.00 <br />