My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 03/20/2012
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2012
>
Agenda - Public Works Committee - 03/20/2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 10:20:02 AM
Creation date
3/16/2012 11:19:32 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
03/20/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
18" HDPE pipe south to County Ditch #3. with an invert elevation of 872.0. Installing the <br />pipe at an elevation of 872.0 will continue to allow 3" stonm events to infiltrate into the <br />soil. The estimated cost to install this outlet is $80,795. <br />156 Lane <br />During large storm events, the wetland in Woodland Green Park ponds water in the <br />backyard of 5220 156 Lane. The area where water ponds was platted with a 75-foot <br />drainage and utility easement, however, this easement has been vacated. The wetland <br />discharges east through an existing storm sewer system to a low area and then north <br />through another storm sewer system to the Rum River. <br />Different sized ponds and outlet configurations were analyzed. One alternative to reduce <br />the high water level of the wetland in Woodland Green Park included constructing a new <br />outlet pipe from the wetland to the low area to the east. This alternative would also <br />require constructing a new outlet at a lower elevation from the low area directly to the <br />Rum River. This would require the approval of the Minnesota Department of Natural <br />Resources and does not appear viable at this time. <br />We recommend filling the backyard of 5220 156 Lane to an elevation equal to the 100 - <br />year high water level. Stormwater would then be contained within Woodland Green Park <br />and would not impact this homeowner. Filling the backyard would require grading in the <br />Woodland Green Park site to create storage to compensate for the lost volume. The <br />estimated cost to complete the grading is $21,175. <br />Sodium Street <br />The house at 16756 Sodium Street has been experiencing water in the basement. One <br />reason for having water in the basement could be caused by the road ditch in front of the <br />house filling and then overflowing toward the house. The water then seeps along the <br />basement wall and eventually into the basement. Another reason for water in the <br />basement could be caused by a high groundwater elevation in the area. <br />We recommend installing a culvert under Sodium Street, regrading the west ditch of <br />Sodium Street, constructing a berm to keep the water in the ditch, and replacing the <br />existing driveway culvert. The ditch would be graded to drain south and a culvert would <br />be installed near the south property line to drain the water to the west. The estimated cost <br />to complete this project is $12,225. <br />
The URL can be used to link to this page
Your browser does not support the video tag.