My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 03/20/2012
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2012
>
Agenda - Public Works Committee - 03/20/2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 10:20:02 AM
Creation date
3/16/2012 11:19:32 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
03/20/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Outlet Pipe <br />Size <br />100-Year <br />HWL <br />Estimated Cost <br />Existing <br />865.5 <br />N/A <br />15" <br />865.4 <br />$1 6,264 <br />18" <br />865.1 <br />$31,566 <br />24" <br />864.3 <br />$45,381 <br />148 Lane <br />Description <br />As shown on Exhibit 1, a low area exists south of 148 Lane. A 15" outlet pipe drains <br />the low area north and then east to DNR Wetland 658W. The invert of the outlet pipe is <br />at elevation 862.3 and the bottom of the low area is at elevation 859.8. Water in the low <br />area has to rise 2.5 feet prior to discharging. The water below the outlet infiltrates into <br />the soil, which may take days depending on the condition of the soil. <br />The existing 100 -year high water level (HWL) for the low area is 865.5. As shown on <br />Exhibit 2, a drainage easement exists in the rear of Lots 2 through 5, Block 2 of Ramsey <br />Comrnons 2 Addition. <br />Alternatives <br />The following alternatives address the water elevation in the existing low area. <br />Alternative 1 <br />In this alternative, a new outlet pipe would be installed between Lot 1 of Ramsey <br />Commons 2 Addition and Lot 2 of Sunny Ponds, as shown on Exhibit 3. It was <br />assumed that the existing outlet pipe to the north would be removed. By installing an <br />outlet pipe in this location, the invert of the outlet pipe can be lowered from 862.3 to <br />861.6. The following table summarizes the 100 -year HWL's and estimated costs for each <br />outlet pipe: <br />* The existing pipe being connected to in Germanium Street is a 15" diamter. Installing the 18" and 24" <br />outlets will require the removal and replacement of this pipe to match the size of the pipe being installed. <br />Tables 1 through 3 include the individual costs for this alternative. <br />Alternative 2 <br />In this alternative, a new outlet pipe would be installed between Lots 2 and 3 of Sunny <br />Ponds, as shown on Exhibit 4. It was assumed that the existing outlet pipe to the north <br />would be removed. By installing an outlet pipe in this location, the invert of the outlet <br />pipe can be lowered from 862.3 to 861.4. This alternative would require additional <br />grading and the acquisition of a permanent easement on the property south of Ramsey <br />Commons 2 Addition and west of Sunny Ponds. The following table summarizes the <br />100 -year HWL's and estimated costs for each outlet pipe: <br />
The URL can be used to link to this page
Your browser does not support the video tag.