Laserfiche WebLink
ITEM <br />NO. <br />DESCRIPTION <br />UNIT <br />UNIT <br />COST <br />TOTAL <br />ESTIMATED <br />QUANTITY <br />TOTAL <br />ESTIMATED <br />COST <br />1 <br />MOBILIZATION <br />LUMP SUM <br />$100.00 <br />1 <br />$100 <br />2 <br />REMOVE STORM STRUCTURE <br />EACH <br />$400.00 <br />1 <br />$400 <br />3 <br />15" RC PIPE APRON <br />EACH <br />$300.00 <br />1 <br />$300 <br />4 <br />CONNECT TO EXISTING STORM SEWER <br />EACH <br />$300.00 <br />1 <br />$300 <br />5 <br />TURF ESTABLISHMENT <br />LUMP SUM <br />$50.00 <br />1 <br />$50 <br />TABLE 8 <br />149TH LANE <br />ALTERNATIVE 1 <br />Estimated Construction Cost <br />Contingency (10 %) <br />Total Estimated Construction Cost <br />$1,150 <br />$115 <br />$1,265 <br />