Laserfiche WebLink
ITEM <br />NO. <br />DESCRIPTION <br />UNIT <br />UNIT <br />COST <br />TOTAL <br />ESTIMATED <br />QUANTITY <br />TOTAL <br />ESTIMATED <br />COST <br />1 <br />MOBILIZATION <br />LUMP SUM <br />$800.00 <br />1 <br />$800 <br />2 <br />CLEARING <br />ACRE <br />$1,500.00 <br />0.2 <br />$300 <br />3 <br />GRUBBING <br />ACRE <br />$1,500.00 <br />0.2 <br />$300 <br />4 <br />REMOVE STORM SEWER <br />LIN FT <br />$1.50 <br />856 <br />$1,284 <br />5 <br />18" METAL APRON <br />EACH <br />$275.00 <br />1 <br />$275 <br />6 <br />18" RC PIPE APRON <br />EACH <br />$350.00 <br />1 <br />$350 <br />7 <br />_18" HDPE PIPE SEWER <br />LIN FT <br />$22.00 <br />850 <br />$18,700 <br />8 <br />18" RC PIPE SEWER DESIGN 3006, CL III <br />LIN FT <br />$23.00 <br />10 <br />$230 <br />9 <br />OUTLET CONTROL STRUCTURE <br />EACH <br />$4,000.00 <br />1 <br />$4,000 <br />10 <br />TURF ESTABLISHMENT <br />ACRE <br />$1,500.00 <br />0.6 <br />$900 <br />TABLE 15 <br />RUM RIVER HILLS GOLF CLUB <br />FLOODING AROUND HOLE #1 - NEW OUTLET STRUCTURE <br />Estimated Construction Cost <br />Contingency (1O %) <br />Total Estimated Construction Cost <br />$27,139 <br />$2,714 <br />$29,853 <br />