My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 03/20/2012
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2012
>
Agenda - Public Works Committee - 03/20/2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 10:20:02 AM
Creation date
3/16/2012 11:19:32 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
03/20/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Location <br />100 -year HWL <br />Depression 1 --- Existing <br />864.7 <br />Depression 1 -- Proposed <br />863.8 <br />Depression 2 — Existing <br />866.0 <br />Depression 2 — Proposed <br />865.3 <br />Location <br />100 -year HWL <br />Depression 1 -- Existing <br />864.7 <br />Depression 1 -- Proposed <br />863.8 <br />Depression 2 -- Existing <br />866.0 <br />Depression 2 — Proposed <br />859.9 <br />Location <br />100 -year HWL <br />Depression 1 -- Existing <br />864.7 <br />Depression 1 -- Proposed <br />862.7 <br />Depression 2 --- Existing <br />866.0 <br />Depression 2 — Proposed <br />859.8 <br />The following table summarizes the 100 -year HWL's for Depression 1, assuming the <br />pond construction shown on Exhibit 15, and Depression 2: <br />As shown, adding this additional outlet pipe has very little effect on the high water levels <br />of the two depressions. After adding the pipe, stormwater actually flows from <br />Depression 2 back to Depression 1 prior to flowing downstream, lowering the HWL in <br />Depression 2. <br />The estimated cost to construct this additional outlet pipe is $37,697. Table 25 includes <br />the individual costs for this alternative. <br />Alternative 5 <br />Alternative 5 includes constructing a 36" outlet pipe from Depression 2. As shown on <br />Exhibit 16, the new outlet pipe would run east from Depression 2 to the Rum River. The <br />new outlet would be constructed at an elevation of 857.8. As part of this alternative, the <br />existing outlet pipe from Depression 2 will be eliminated. This alternative also assumes <br />that the new outlet from Depression 1, as discussed in Alternative 4, would also be <br />constructed. <br />The following table summarizes the 100 -year HWL's for Depression 1, assuming the <br />pond construction shown on Exhibit 14, and Depression 2: <br />The following table summarizes the 100 -year HWL's for Depression 1, assuming the <br />pond construction shown on Exhibit 15, and Depression 2: <br />As shown, adding this outlet pipe has a significant effect on the high water levels of the <br />two depressions. This alternative would have to be approved by the Minnesota <br />Department of Natural Resources. <br />
The URL can be used to link to this page
Your browser does not support the video tag.