Laserfiche WebLink
Location <br />100 -year HWL <br />Depression 1 --- Existing <br />864.7 <br />Depression 1 -- Proposed <br />863.8 <br />Depression 2 — Existing <br />866.0 <br />Depression 2 — Proposed <br />865.3 <br />Location <br />100 -year HWL <br />Depression 1 -- Existing <br />864.7 <br />Depression 1 -- Proposed <br />863.8 <br />Depression 2 -- Existing <br />866.0 <br />Depression 2 — Proposed <br />859.9 <br />Location <br />100 -year HWL <br />Depression 1 -- Existing <br />864.7 <br />Depression 1 -- Proposed <br />862.7 <br />Depression 2 --- Existing <br />866.0 <br />Depression 2 — Proposed <br />859.8 <br />The following table summarizes the 100 -year HWL's for Depression 1, assuming the <br />pond construction shown on Exhibit 15, and Depression 2: <br />As shown, adding this additional outlet pipe has very little effect on the high water levels <br />of the two depressions. After adding the pipe, stormwater actually flows from <br />Depression 2 back to Depression 1 prior to flowing downstream, lowering the HWL in <br />Depression 2. <br />The estimated cost to construct this additional outlet pipe is $37,697. Table 25 includes <br />the individual costs for this alternative. <br />Alternative 5 <br />Alternative 5 includes constructing a 36" outlet pipe from Depression 2. As shown on <br />Exhibit 16, the new outlet pipe would run east from Depression 2 to the Rum River. The <br />new outlet would be constructed at an elevation of 857.8. As part of this alternative, the <br />existing outlet pipe from Depression 2 will be eliminated. This alternative also assumes <br />that the new outlet from Depression 1, as discussed in Alternative 4, would also be <br />constructed. <br />The following table summarizes the 100 -year HWL's for Depression 1, assuming the <br />pond construction shown on Exhibit 14, and Depression 2: <br />The following table summarizes the 100 -year HWL's for Depression 1, assuming the <br />pond construction shown on Exhibit 15, and Depression 2: <br />As shown, adding this outlet pipe has a significant effect on the high water levels of the <br />two depressions. This alternative would have to be approved by the Minnesota <br />Department of Natural Resources. <br />