My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 04/24/2012
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2012
>
Agenda - Council Work Session - 04/24/2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 12:15:42 PM
Creation date
4/19/2012 4:34:40 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
04/24/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC Work Session 2. 2. <br />Meeting Date: 04/24/2012 <br />By: Tim Himmer, Engineering/Public <br />Works <br />Title: <br />Discuss Comprehensive Utility Plan Updates <br />Background: <br />On August 23, 2011 staff met with the City Council in work session to review the City's 2011 development cost <br />study. This was a comprehensive review of where the City currently stands in relation to other municipalities with <br />regard to development costs (utility trunk fees, building permit fees, escrows, etc.). During that meeting utility rates <br />were discussed; particularly how those rates are determined. Rates are determined by taking a comprehensive look <br />at the City's utility system, projecting future growth, and then determining the infrastructure needs to support such <br />growth. A plan is then developed that outlines potential timelines and costs for infrastructure improvements. The <br />ultimate costs to construct and maintain that utility system is then evaluated to determine the appropriate funding <br />mechanism to distribute those costs to users and/or the development community. Revisions to those rates are then <br />adjusted annually, with the adoption of the annual rates and charges, and are based on the construction index related <br />to inflation and construction costs. <br />On November 15, 2011 the topic of comprehensive utility plan updates, and corresponding rate studies, was <br />discussed by the Public Works Committee. This conversation was timely, in that the City Council wanted to <br />understand how updates to these plans may impact adoption of the City's annual rates and charges. The Council <br />wanted to delay action on adopting rates and charges for 2012 until these utility plan updates were completed. <br />Since that time the 2012 rates and charges were adopted by the City Council in December, with the idea that the <br />utility fees could be revised (if necessary) once the studies were updated and the results of the rate study <br />completed. On January 10, 2012 the City Council awarded contracts to Bolton & Menk and Landform to undertake <br />this study, which was last completed in 2004. <br />The first order of business in advancing these plan updates is to review growth projections, which was the topic of <br />conversation with the City Council on February 6, 2012. Without first understanding the assumptions related to <br />how the City intends to grow, updates to these plans are extremely difficult. At that meeting Council directed staff <br />to proceed with plan updates using the same assumptions from the existing (2004) comprehensive utility plans and <br />2030 Comprehensive Plan for the City; including growth, densities, and flow projections. <br />On March 27, 2012 City staff and our consultants were again in front of the City Council at work session to discuss <br />the sanitary sewer system. Direction from that meeting included maintaining a minimum fund balance equal to the <br />average annual expenses over the study period, installation of a lift station to serve the Northeast Sewer Area (area <br />near TH 47 and 167th Ave), and the creation of a residential equivalency factor for high density residential uses. <br />The discussion for tonight's meeting will primarily focus on the water system. Through the evaluation of this <br />system we have carried forward the previous assumptions as directed by the Council with respect to growth <br />projections, minimum fund balance, and use of a residential equivalency factor for high density residential <br />development. Bolton & Menk has analyzed the utility systems, consistent with this direction, and has developed a <br />preliminary Capital Improvement Program (CIP) that evaluates future expenditures and projected revenues from <br />user rates and development fees. <br />Observations: <br />
The URL can be used to link to this page
Your browser does not support the video tag.